Performance outcome Acceptable outcome Applicant response Assessment
tidal works do not impede the of any existing stormwater
discharge of stormwater; outlet.
(b) subject to paragraph (c),
prescribed tidal works do not
restrict access to any
stormwater outlet;
(c) if a relevant planning scheme
standard is more stringent
than the standard mentioned
in paragraph (a) or (b)—the
relevant planning scheme
standard, to the extent it is
more stringent than the
standard mentioned in
paragraph (a) or (b).
12.6 Prescribed tidal works are The design and construction of the Complies with Performance The Project satisfactorily complies
designed and constructed in a prescribed tidal works is Outcome 12.6 (subject to with PO12.6 subject to monitoring.
way to ensure they do not consistent with the following monitoring) Given the nature of the works
adversely affect the water standards— As oysters are filter (placement of additional oyster/rock
quality of tidal water, including, (a) subject to paragraph (b), each feeders, the works would substrates on the seabed) there is
in particular, as a result of— Australian Standard relevant be expected to result in the potential for short-term impacts
(a) release, into the tidal water, to the design or construction improved water quality to water quality.
of materials used in the of structures under, within or outcomes for the Noosa The Project demonstrates
construction of the works; over tidal water, to the extent River. appropriate mitigation and
or the requirements stated in the During construction, rock management measures have been
(b) disturbance to the sediment Standard are directed at placement activities may considered through the Noosa
on the bed and banks of the maintaining the water quality result in some suspension Oyster Ecosystem Restoration
tidal water; or of tidal water; of sediment. Construction Project – Project Restoration Plan. In
(c) exposure to acid sulphate (b) if a relevant planning scheme materials are to be clean addition, as required under
soils standard is more stringent and free of topsoil or condition 21 of SARA Decision
than the standard mentioned organic material. Notice, the Inspection and
in paragraph (a)—the Construction is to be Monitoring Program will monitor any
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.