Original source · versioned page text
2022-05-16 GC Agenda - Item 7 - Attachment 1 - Report from Marine Approval Specialists
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Performance outcome Acceptable outcome Applicant response Assessment
relevant planning scheme managed to minimise potential impacts and provide
standard, to the extent it is potential for impacts and management measures to remediate
more stringent than the monitoring of sensitive any adverse impacts should they
standard mentioned in receptors is to be occur.
paragraph (a). undertaken. Detailed Furthermore, the works must be
requirements are outlined undertaken in accordance with an
in ICM drawing NROR- approved Construction
2021-02 and section 6.4 of Environmental Management Plan
the Project Restoration (CEMP) as per Council approval
Plan. conditions.
a) Construction waste
or excess materials
are not to be
released into tidal
waters.
b) Works do not
include
disturbance of
sediment on the
seabed or banks.
Incidental
disturbance as a
result of rock
placement is to be
minimised and
monitored as
described above.
c) Works do not
include
disturbance or
exposure of
sediment (Acid
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.