Performance outcome Acceptable outcome Applicant response Assessment
to the works, in terms of
the maximum number of
persons that may be on
the works at any given
time or the maximum
number of vehicles of a
particular type that may
be on or moored at the
works at any given time;
(b) if a relevant planning scheme
standard is more stringent
than the standard mentioned
in paragraph (a)—the
relevant planning scheme
standard, to the extent it is
more stringent than the
standard mentioned in
paragraph (a).
12.9 Prescribed tidal works, other The design and construction of the Not applicable. The Project is not located within a
than a prescribed deck for a prescribed tidal works is Not in a canal. canal therefore PO12.9 is not
private purpose, are designed consistent with each relevant applicable.
and constructed in a way to planning scheme standard.
ensure the use of tidal water in a
canal for a non-maritime
purpose is minimised.
12.10 Prescribed tidal works that are (s 5(2) outcome) Not applicable. The Project is not a prescribed deck
a prescribed deck and for a The design and construction of the Not a deck for a private for a private purpose therefore
private purpose, are designed prescribed deck is consistent with purpose. PO12.10 is not applicable.
and constructed in a way to the following standards—
ensure the use of tidal water in a (a) subject to paragraph (c), a
canal for a non-maritime prescribed deck does not
purpose is minimised. extend more than 3m from
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.