Performance outcome Acceptable outcome Applicant response Assessment
the waterfront boundary of
the lot connected to the deck;
(b) subject to paragraph (c), a
prescribed deck is at least 3m
inside of the side boundary or
extended side boundary of
the lot connected to the deck;
(c) if a relevant planning scheme
standard is more stringent
than the standard mentioned
in paragraph (a) or (b)—the
relevant planning scheme
standard, to the extent it is
more stringent than the
standard mentioned in
paragraph (a) or (b).
Design, construction and safety—boat ramps and slipways for private purpose
13.1 Prescribed tidal works that are a (s 5(2) outcome) Not applicable. The Project is not a boat ramp or
boat ramp or slipway for a The design and construction of the Not a boat ramp or slipway therefore PO13.1 is not
private purpose are designed and boat ramp or slipway is consistent slipway. applicable.
constructed in a way to ensure with the following standards—
they are structurally sound while (a) subject to paragraph (c), the
also ensuring the safe movement walls at the edge of the boat
of vehicles or persons between ramp or slipway penetrate
the boat ramp or slipway and the into the earth at least 600mm
surface of the land on which the below the surface of the land
boat ramp or slipway is located. on which the boat ramp or
slipway is located;
(b) subject to paragraph (c), the
surface of the boat ramp or
slipway is no more than
200mm above the surface of
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.