2022-05-16 GC Agenda - Item 7 - Attachment 1 - Report from Marine Approval Specialists

of 80

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Performance outcome                       Acceptable outcome                   Applicant response   Assessment
                                          than the standard mentioned
                                          in paragraph (a), (b) or
                                          (c)—the relevant planning
                                          scheme standard, to the
                                          extent it is more stringent
                                          than the standard mentioned
                                          in paragraph (a), (b) or (c).
Design, construction and safety—bridges
14.1 Prescribed tidal works that are a    The design and construction of the   Not applicable       The Project is not a bridge therefore
bridge do not adversely affect            bridge is consistent with the        Not a bridge         PO14.1 is not applicable.
existing public use of tidal              following standards—
water, including, for example,            (a) subject to paragraph (b), the
use of the tidal water for                clearance levels under a
canoeing, swimming or other               bridge are high enough to
recreational activities.                  allow continued public use of
                                          tidal water over which it is
                                          constructed;
                                          (b) if a relevant planning scheme
                                          standard is more stringent
                                          than the standard mentioned
                                          in paragraph (a)—the
                                          relevant planning scheme
                                          standard, to the extent it is
                                          more stringent than the
                                          standard mentioned in
                                          paragraph (a).
14.2 Prescribed tidal works that are a    The design and construction of the   Not applicable       The Project is not a bridge therefore
bridge do not adversely affect            bridge is consistent with the        Not a bridge.        PO14.1 is not applicable.
the flow of tidal water under the         following standards—
bridge.                                   (a) subject to paragraph (b)—
                                          (i) if a bridge can be
                                          adequately supported
Log in to download the original file

2022-05-16 GC Agenda - Item 7 - Attachment 1 - Report from Marine Approval Specialists(PDF, 3MB).pdf · 3.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.