Original source · versioned page text
2022-05-16 GC Agenda - Item 7 - Attachment 1 - Report from Marine Approval Specialists
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Performance outcome Acceptable outcome Applicant response Assessment
without erecting or
placing a foundation
support in tidal
water—no foundation
support to support the
bridge is erected or
placed in the tidal water;
or
(ii) otherwise—only the
minimum number of
foundation supports
required to support the
bridge is used;
(b) if a relevant planning scheme
standard is more stringent
than the standard mentioned
in paragraph (a)—the
relevant planning scheme
standard, to the extent it is
more stringent than the
standard mentioned in
paragraph (a).
Design, construction and safety—prescribed decks
15.1 Prescribed tidal works that are a (s 5(2) outcome) Not applicable The Project is not a prescribed deck
prescribed deck and for a private The design and construction of the Not a deck therefore PO15.1 is not applicable.
purpose are designed and prescribed deck is consistent with
constructed in a way to ensure the following standards—
the deck is able to support its (a) subject to paragraph (b), each
intended loads, having regard to of the following Australian
its relevant loading matters. Standards to the extent
requirements stated in the
Standard apply to relevant
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.