Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

2022-05-16 GC Agenda - Item 7 - Attachment 1 - Report from Marine Approval Specialists

of 80

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Performance outcome                       Acceptable outcome                   Applicant response   Assessment
                                          without erecting or
                                          placing a foundation
                                          support in tidal
                                          water—no foundation
                                          support to support the
                                          bridge is erected or
                                          placed in the tidal water;
                                          or
                                          (ii) otherwise—only the
                                          minimum number of
                                          foundation supports
                                          required to support the
                                          bridge is used;
                                          (b) if a relevant planning scheme
                                          standard is more stringent
                                          than the standard mentioned
                                          in paragraph (a)—the
                                          relevant planning scheme
                                          standard, to the extent it is
                                          more stringent than the
                                          standard mentioned in
                                          paragraph (a).
Design, construction and safety—prescribed decks
15.1 Prescribed tidal works that are a    (s 5(2) outcome)                     Not applicable       The Project is not a prescribed deck
prescribed deck and for a private         The design and construction of the   Not a deck           therefore PO15.1 is not applicable.
purpose are designed and                  prescribed deck is consistent with
constructed in a way to ensure            the following standards—
the deck is able to support its           (a) subject to paragraph (b), each
intended loads, having regard to          of the following Australian
its relevant loading matters.             Standards to the extent
                                          requirements stated in the
                                          Standard apply to relevant
Log in to download the original file

2022-05-16 GC Agenda - Item 7 - Attachment 1 - Report from Marine Approval Specialists(PDF, 3MB).pdf · 3.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.