Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

2022-05-16 GC Agenda - Item 7 - Attachment 1 - Report from Marine Approval Specialists

of 80

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Performance outcome                      Acceptable outcome                   Applicant response   Assessment
                                         (vi) AS 4997;
                                         (b) if a relevant planning scheme
                                         standard is more stringent
                                         than the standard mentioned
                                         in paragraph (a)—the
                                         relevant planning scheme
                                         standard, to the extent it is
                                         more stringent than the
                                         standard mentioned in
                                         paragraph (a).
18.2 Prescribed tidal works that are a   (s 5(2) outcome)                     Not applicable.      The Project is not a pontoon
pontoon and used only for                The design and construction of the   Not a pontoon.       therefore PO18.2 is not applicable.
rowing are designed and                  pontoon is consistent with the
constructed in a way to ensure—          following standards—
(a) the pontoon is able to               (a) subject to paragraph (b)—
support its intended loads,              (i) for a pontoon
having regard to its relevant            constructed within a
loading matters; and                     marina—AS 3962 to the
(b) the pontoon is safe for              extent requirements
persons using the pontoon                stated in the Standard
to launch and retrieve                   apply to relevant loading
rowing vessels.                          matters for the design or
                                         construction of the
                                         pontoon; or
                                         (ii) for a pontoon not
                                         constructed within a
                                         marina—
                                         (A) the access walkway
                                         of a pontoon used
                                         only for rowing is
                                         able to support at
                                         least a live load of
Log in to download the original file

2022-05-16 GC Agenda - Item 7 - Attachment 1 - Report from Marine Approval Specialists(PDF, 3MB).pdf · 3.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.