Skip to the record
The gold standard in government transparency.

Original source · versioned page text

2022-05-16 GC Agenda - Item 7 - Attachment 1 - Report from Marine Approval Specialists

of 80

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Performance outcome                       Acceptable outcome                  Applicant response   Assessment
                                          service—the pipeline or
                                          service is installed at
                                          least 1.2m below the
                                          surface of land, after it is
                                          installed;
                                          (b) if a relevant planning scheme
                                          standard is more stringent
                                          than the standard mentioned
                                          in paragraph (a)—the
                                          relevant planning scheme
                                          standard, to the extent it is
                                          more stringent than the
                                          standard mentioned in
                                          paragraph (a).
Design, construction and safety—pontoons
18.1 Prescribed tidal works that are a   s 5(2) outcome)                      Not applicable.      The Project is not a pontoon
pontoon and not used only for            The design and construction of the   Not a pontoon.       therefore PO18.1 is not applicable.
rowing, are designed and                 pontoon is consistent with the
constructed in a way to ensure           following standards—
the pontoon is able to support its       (a) subject to paragraph (b), each
intended loads, having regard to         of the following Australian
its relevant loading matters.            Standards to the extent
                                         requirements stated in the
                                         Standard apply to relevant
                                         loading matters for the design
                                         or construction of the
                                         pontoon—
                                         (i) AS/NZS 1170.0;
                                         (ii) AS/NZS 1170.1;
                                         (iii) AS/NZS 1170.2;
                                         (iv) AS 1170.4;
                                         (v) AS 3962;
Log in to download the original file

2022-05-16 GC Agenda - Item 7 - Attachment 1 - Report from Marine Approval Specialists(PDF, 3MB).pdf · 3.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.