Original source · versioned page text
2022-05-16 GC Agenda - Item 7 - Attachment 1 - Report from Marine Approval Specialists
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Performance outcome Acceptable outcome Applicant response Assessment
service—the pipeline or
service is installed at
least 1.2m below the
surface of land, after it is
installed;
(b) if a relevant planning scheme
standard is more stringent
than the standard mentioned
in paragraph (a)—the
relevant planning scheme
standard, to the extent it is
more stringent than the
standard mentioned in
paragraph (a).
Design, construction and safety—pontoons
18.1 Prescribed tidal works that are a s 5(2) outcome) Not applicable. The Project is not a pontoon
pontoon and not used only for The design and construction of the Not a pontoon. therefore PO18.1 is not applicable.
rowing, are designed and pontoon is consistent with the
constructed in a way to ensure following standards—
the pontoon is able to support its (a) subject to paragraph (b), each
intended loads, having regard to of the following Australian
its relevant loading matters. Standards to the extent
requirements stated in the
Standard apply to relevant
loading matters for the design
or construction of the
pontoon—
(i) AS/NZS 1170.0;
(ii) AS/NZS 1170.1;
(iii) AS/NZS 1170.2;
(iv) AS 1170.4;
(v) AS 3962;
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.