Skip to the record
Every meeting, every word.

Original source · versioned page text

2022-05-16 GC Agenda - Item 7 - Attachment 1 - Report from Marine Approval Specialists

of 80

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Performance outcome                      Acceptable outcome                   Applicant response   Assessment
18.3 Prescribed tidal works that are a   (s 5(2) outcome)                     Not applicable.      The Project is not a pontoon
pontoon are designed and                 The design and construction of the   Not a pontoon.       therefore PO18.3 is not applicable.
constructed in a way to ensure           pontoon is consistent with the
any load applied to the pontoon          following standards—
by a person or thing on the              (a) subject to paragraph (b)—
pontoon does not cause the               (i) for a pontoon
pontoon to tip over or tilt to a         constructed within a
degree causing the person or             marina—AS 3962 to the
thing to fall off the pontoon.           extent requirements
                                         stated in the Standard
                                         apply to relevant loading
                                         matters for the design or
                                         construction of the
                                         pontoon; or
                                         (ii) for a pontoon not
                                         constructed within a
                                         marina—
                                         (A) the pontoon’s
                                         access walkway
                                         extends at least
                                         500mm onto the
                                         pontoon’s flotation
                                         unit; and
                                         (B) for a pontoon used
                                         only for
                                         rowing—at least
                                         75mm of the height
                                         of the pontoon’s
                                         flotation unit
                                         remains above the
                                         water over which it
                                         is constructed if a
Log in to download the original file

2022-05-16 GC Agenda - Item 7 - Attachment 1 - Report from Marine Approval Specialists(PDF, 3MB).pdf · 3.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.