Original source · versioned page text
2022-05-16 GC Agenda - Item 7 - Attachment 1 - Report from Marine Approval Specialists
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Performance outcome Acceptable outcome Applicant response Assessment
distributed live load
is applied to half of
the surface of the
pontoon’s flotation
unit and all of the
surface of the
pontoon’s access
walkways; and
(C) for a pontoon other
than a pontoon
mentioned in
sub-subparagraph
(B)—the top
surface of the
pontoon’s flotation
unit remains above
the water over
which it is
constructed if a
distributed live load
of 1.5kPa is applied
to half of the
surface of the
pontoon’s flotation
unit and all of the
surface of the
pontoon’s access
walkways; and
(D) the whole base of
the pontoon’s
flotation unit
remains in contact
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.