Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

2022-05-16 GC Agenda - Item 7 - Attachment 1 - Report from Marine Approval Specialists

of 80

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Performance outcome                      Acceptable outcome                   Applicant response   Assessment
                                         relevant planning scheme
                                         standard, to the extent it is
                                         more stringent than the
                                         standard mentioned in
                                         paragraph (a).
18.6 Prescribed tidal works that are a   (s 5(2) outcome)                     Not applicable.      The Project is not a pontoon
pontoon permanently used for             The design and construction of the   Not a pontoon.       therefore PO18.6 is not applicable.
the fuelling of, or the storage of       pontoon is consistent with the
fuel for, vessels are designed and       following standards—
constructed in a way to ensure—          (a) subject to paragraph (c), each
(a) the pontoon is able to               of the following Australian
support its intended loads,              Standards to the extent
having regard to its relevant            requirements stated in the
loading matters; and                     Standard apply to relevant
(b) the pontoon is safe for              loading matters for the design
persons using the pontoon.               or construction of the
                                         pontoon—
                                         (i) AS/NZS 1170.0;
                                         (ii) AS/NZS 1170.1;
                                         (iii) AS/NZS 1170.2;
                                         (iv) AS 1170.4;
                                         (v) AS 4997;
                                         (b) subject to paragraph (c),
                                         AS 3962 to the extent
                                         requirements stated in the
                                         Standard apply to a pontoon
                                         permanently used for the
                                         fuelling of, or the storage of
                                         fuel;
                                         (c) if a relevant planning scheme
                                         standard is more stringent
                                         than the standard mentioned
Log in to download the original file

2022-05-16 GC Agenda - Item 7 - Attachment 1 - Report from Marine Approval Specialists(PDF, 3MB).pdf · 3.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.