2022-05-16 GC Agenda - Item 7 - Attachment 1 - Report from Marine Approval Specialists
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Performance outcome Acceptable outcome Applicant response Assessment
relevant planning scheme
standard, to the extent it is
more stringent than the
standard mentioned in
paragraph (a).
18.6 Prescribed tidal works that are a (s 5(2) outcome) Not applicable. The Project is not a pontoon
pontoon permanently used for The design and construction of the Not a pontoon. therefore PO18.6 is not applicable.
the fuelling of, or the storage of pontoon is consistent with the
fuel for, vessels are designed and following standards—
constructed in a way to ensure— (a) subject to paragraph (c), each
(a) the pontoon is able to of the following Australian
support its intended loads, Standards to the extent
having regard to its relevant requirements stated in the
loading matters; and Standard apply to relevant
(b) the pontoon is safe for loading matters for the design
persons using the pontoon. or construction of the
pontoon—
(i) AS/NZS 1170.0;
(ii) AS/NZS 1170.1;
(iii) AS/NZS 1170.2;
(iv) AS 1170.4;
(v) AS 4997;
(b) subject to paragraph (c),
AS 3962 to the extent
requirements stated in the
Standard apply to a pontoon
permanently used for the
fuelling of, or the storage of
fuel;
(c) if a relevant planning scheme
standard is more stringent
than the standard mentioned
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.