Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

2022-05-16 GC Agenda - Item 7 - Attachment 1 - Report from Marine Approval Specialists

of 80

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Performance outcome                      Acceptable outcome                    Applicant response   Assessment
around the pontoon,                      flotation unit to detach from
including tidal water                    the system for mooring the
affected by a flood or                   unit—
storm tide.                              (i) the standard applying
                                         under paragraph (a); and
                                         (ii) the pontoon’s flotation
                                         unit is restrained with a
                                         tethering system so that
                                         it can withstand the
                                         effects of the event;
                                         (c) if a relevant planning scheme
                                         standard is more stringent
                                         than the standard mentioned
                                         in paragraph (a) or (b)—the
                                         relevant planning scheme
                                         standard, to the extent it is
                                         more stringent than the
                                         standard mentioned in
                                         paragraph (a) or (b).
18.5 Prescribed tidal works that are a   The design and construction of the    Not applicable.      The Project is not a pontoon
pontoon identifies the lot to            pontoon is consistent with the        Not a pontoon.       therefore PO18.5 is not applicable.
which the pontoon is connected.          following standards—
                                         (a) a label that identifies the lot
                                         to which the pontoon is
                                         connected is written or
                                         stamped on, or fixed to, the
                                         outside of the pontoon’s
                                         flotation unit;
                                         (b) if a relevant planning scheme
                                         standard is more stringent
                                         than the standard mentioned
                                         in paragraph (a)—the
Log in to download the original file

2022-05-16 GC Agenda - Item 7 - Attachment 1 - Report from Marine Approval Specialists(PDF, 3MB).pdf · 3.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.