Council archive · source document
07/1255 - Lot Recofiguration - 2 Lots [As Published] · 152007.1255
INTEGRATED PLANNING ACT 1997, Works that take overland flow water The relevant wid river declaration will state works that take overland flow water are either Self assessable or assessable, or are exempt from wid river requirements. If you ticked Q13 7), your application must be assessed by NRW against the Wid Rivers Code and must comply with the code. Ifyou ticked Q13 ii) an application is not required to be made however the works must comply with the relevant self-assessable section of the Wid Rivers Code, otherwise the works become assessable development for which an application is required and must be assessed by NRW against the relevant part of the Wild Rivers Code and must comply with the code. If you ticked Q13 ffi) your application is not subject to wild river requirements. Applications for development that is other than that stated to be assessable, self-assessable or exempt will not be accepted. 13. IDAS Assessment Checklist, Version 20, 2 April 2007 Does the application involve works that take overland flow water in a HPA or an FMA? (no J YES (ensure you have completed Part Ks of Form 1) If YES, is the application for works stated in the relevant wild river declaration to be? (Ji) assessable works CT ii) self-assessable works (J iii) exempt works Works that interfere with overland flow water The relevant wild river dectaration will state works that interfere with overfand flow water that are either self assessable, assessable or exempt from wild river requirements. Ifyou ticked Q15 i), your application must be assessed by NRW against the Wild Rivers Code and must comply with the code. if you ticked 15 ii} an application is not required to be made however the works must comply with the relevant set-assessabie section of the Wild Rivers Code, otherwise the works become assessable development for which an application 's required and must be assessed by NRW against the relevant part of the Wild Rivers Code and must comply with the code. Ifyou ticked Q15 iii) your application is not subject to wild river requirements. Applications for development that is other than that stated to be assessable, self-assessable or exempt will not be accepted. Does the application involve works that interfere with overland flow water in a FMA? O NO C] YES (ensure you have completed Part Kio of Form 1) \f YES, is the application for works stated in the relevant wild rivers declaration to be? (J i) assessable works J ii) self-assessable works LD iii) exempt works Waterway barrier works Applications for building or raising waterway barrier works in a HPA will not be accepted. If you answered YES to Q16, your application must be assessed by DPIF against the Wild Rivers Code and must comply with the code. Aquaculture (non ERA) Applications for aquacutture in a HPA will not be accepted. Hf you answered YES to Q17, your application must be assessed by DPIF against the Wid Rivers Code and must comply with the code. 16. Does the application involve building or raising waterway barrier works in a PA? CO NO O YES (ensure you have completed Part O3 of Form 1) Does the application involve aquaculture ina PA? [no YES (ensure you have completed Part O; of Form 1) Works that interfere with water in a watercourse Note: If the development is proposed in a HPA, applications for afl works that interfere with water In a watercourse (including dams or weirs, steam reatignment or stream diversion) will not be accepted. Ina PA, applications for insteam dams and weirs may be accepted in nominated waterways. Ifyou ticked box if} in Q19, your application will not be accepted. Note: Operational works outside a HPA or nominated waterway are not subject to wild fiver requirements. More information and locations of nominated waterways is available by contact NRW, accessing the department's website worw.new.qid.gov.au or contacting the department by email on: wild [email protected] the application involve operational works that interfere with water in a watercourse that is in a nominated waterway in a PA? CINo IFYES, O i) The application is for an instream dam or weir; or (J ii) The application is for operational works that interfere with water in a watercourse, and is for development other than a dam or weir. O YES (ensure you have completed the relevant Part K of Form 1) Page 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1255 - Lot Recofiguration - 2 Lots [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.8 MB (small file)
- File type
No other editions are linked here.