Council archive · source document
07/1255 - Lot Recofiguration - 2 Lots [As Published] · 152007.1255
INTEGRATED PLANNING ACT 1997 Environmentally relevant activitles Most applications for an ERA in a HPA will not be accepted. Applications which may be made tequire referral to the EPA. The assessment of some ERAs is assessed by NRW, others have been devolved to DPIF, NRW or delegated local government (see EPA website for more information on devolved ERAs) H you answered NO to Q20 you do not need to complete Qs 21-24, Ifyou answered YES to Q20 and the development is in a PA, your application must be assessed by the administering authority?+ against the Wild Rivers Code and must comply with the code, unless the proposal is for development where an application wilt not be accepted, or is exempt from wild river Tequirements (see Q2). You will be able to determine if an application will not be accepted for the devetopment by answering Q21 - Q24. if you answered NO to Q21, you do not need to complete Q22. If you answered YES to Q21 you are required to complete Q22, if you answered NO to Q22, the application wit not be accepted. If you answered YES to Q22, the application must be assessed by NRW against the Wild Rivers Code and must comply with the code. ff you answered NO to 023 and the development! is proposed in the HPA the application will not be accepted. tf you answered YES to Q23, the application must be assessed by the EPA or NRW (as prescribed in schedule 8A of the IPA) against the Wild Rivers Code and must comply with the code. If you answered YES to Q24 the application will not be accepted. If you answered NO to Q24, your application must be assessed by NRW against the Wild Rivers Code and must comply with the code. Exempt ERAs in a designated urban area Ifthe development is proposed in a designated urban area there may be no wild river fequirements, See Section 2.02. Note: All apptications that can be accepted must be assessed against and must comply with the Wild Rivers Code (other than exempt ERAs in a designated urban area). 20. 21. 22. 23, 24, IDAS Assessment Checklist, Version 20, 2 April 2007 Does the application involve an ERA? O NO 1] YES (ensure you have completed Part G of Form) \s the application for an ERA 20 instream? (Jno Cl Yes ts a quarry allocation notice held for the proposed ERA 20 instream? Jno C1 Yes Does the application involve any of the following in a HPA? i) a level 2 ERA 11, (and is for specified works or a residential complex) ii) an ERA 19 (dredging) iii) Low impact ERA 20 (out of stream) for specified works or a residential complex (as defined in the Wild Rivers Act 2005, and Environmental Protection Act 1994) iv) an ERA 22 (out of stream) CI no CJ yYes Is the proposed development for ERA 20 (out of stream) and; — inaFMA; and — not low impact; and — not for a residential complex in the area, or for specified works. LI] No LC] yes Documentation Ifyou answered NO to 025, your application may be subject to an information request and processing of the application may be delayed. 25. Has documentation been included with the application describing how the applicant proposes to comply with the mandatory requirements, required outcomes, and/ or performance requirements as set out in the relevant part/s of the Wild Rivers Code? LJ No (J Yes 1 The administering authority may be either the EPA, or if devolved or delegated, the local goverment, DPIF or NRW. Page 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1255 - Lot Recofiguration - 2 Lots [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.8 MB (small file)
- File type
No other editions are linked here.