Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

DA Form 1

of 12

Page text shows just the words. Original shows the document exactly as it was published.

        6.3) Additional aspects of development
            Additional aspects of development are relevant to this development application and the details for these aspects
            that would be required under Part 3 Section 1 of this form have been attached to this development application
            Not required
        6.4) Is the application for State facilitated development?
            Yes - Has a notice of declaration been given by the Minister?
            No

     Section 2 – Further development details
        7) Does the proposed development application involve any of the following?
        Material change of use                       Yes – complete division 1 if assessable against a local planning instrument
        Reconfiguring a lot                          Yes – complete division 2
        Operational work                             Yes – complete division 3
        Building work                                Yes – complete DA Form 2 – Building work details

     Division 1 – Material change of use
     Note: This division is only required to be completed if any part of the development application involves a material change of use assessable against a
           local planning instrument.
        8.1) Describe the proposed material change of use
        Provide a general description of the                 Provide the planning scheme definition                Number of dwelling       Gross floor
        proposed use                                         (include each definition in a new row)                units (if applicable)    area (m2)
                                                                                                                                            (if applicable)




        8.2) Does the proposed use involve the use of existing buildings on the premises?
            Yes
            No
        8.3) Does the proposed development relate to temporary accepted development under the Planning Regulation?
            Yes – provide details below or include details in a schedule to this development application
            No
        Provide a general description of the temporary accepted development                                       Specify the stated period dates
                                                                                                                  under the Planning Regulation



     Division 2 – Reconfiguring a lot
     Note: This division is only required to be completed if any part of the development application involves reconfiguring a lot.
        9.1) What is the total number of existing lots making up the premises?


        9.2) What is the nature of the lot reconfiguration? (tick all applicable boxes)
            Subdivision (complete 10)                                           Dividing land into parts by agreement (complete 11)
            Boundary realignment (complete 12)                                  Creating or changing an easement giving access to a lot
                                                                                from a constructed road (complete 13)




Document Set ID: 23371843
Version: 1, Version Date: 26/11/2024
Log in to download the original file

DA Form 1.pdf · 188 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.