Skip to the record
Accept no substitutions.

Original source · versioned page text

DA Form 1

of 12

Page text shows just the words. Original shows the document exactly as it was published.

        10) Subdivision
        10.1) For this development, how many lots are being created and what is the intended use of those lots:
        Intended use of lots created              Residential              Commercial              Industrial              Other, please specify:


        Number of lots created

        10.2) Will the subdivision be staged?
            Yes – provide additional details below
            No
        How many stages will the works include?
        What stage(s) will this development application
        apply to?

       11) Dividing land into parts by agreement – how many parts are being created and what is the intended use of the
           parts?
        Intended use of parts created             Residential              Commercial              Industrial              Other, please specify:


        Number of parts created

        12) Boundary realignment
        12.1) What are the current and proposed areas for each lot comprising the premises?
                                       Current lot                                                              Proposed lot
        Lot on plan description              Area (m2)                             Lot on plan description              Area (m2)



        12.2) What is the reason for the boundary realignment?



        13) What are the dimensions and nature of any existing easements being changed and/or any proposed easement?
        (attach schedule if there are more than two easements)
        Existing or               Width (m)          Length (m)     Purpose of the easement? (e.g.                     Identify the land/lot(s)
        proposed?                                                   pedestrian access)                                 benefitted by the easement




     Division 3 – Operational work
     Note: This division is only required to be completed if any part of the development application involves operational work.
        14.1) What is the nature of the operational work?
            Road work                                               Stormwater                             Water infrastructure
            Drainage work                                           Earthworks                             Sewage infrastructure
            Landscaping                                             Signage                                Clearing vegetation
            Other – please specify:               application for a non-standard vehicle crossover
        14.2) Is the operational work necessary to facilitate the creation of new lots? (e.g. subdivision)
            Yes – specify number of new lots:
            No




Document Set ID: 23371843
Version: 1, Version Date: 26/11/2024
Log in to download the original file

DA Form 1.pdf · 188 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.