Planning Report
PO12 PO12 AO12.1 Development and associated site During the construction of the
works, including filling and dwelling appropriate measures
Development and excavation are designed and will be undertaken to ensure
associated site works do constructed to ensure overland flow overland flow and flooding are
not directly, indirectly or and/or flooding is not worsened, not worsened, impeded, or
cumulatively cause impeded, or otherwise diverted to
otherwise diverted to adversely
adversely affect other properties.
adverse impacts external affect the adjoining properties.
to the development site
by:
(a) causing ponding of
water;
(b) increasing flooding,
which adversely
affects the safety
or
use of any land
upstream and
downstream;
c. adversely affecting
the flow of water in
any overland flow
path.
16 | P a g e
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.