Skip to the record
Beware of cheap imitations.

Original source · versioned page text

Planning Report

of 36

Page text shows just the words. Original shows the document exactly as it was published.

Performance outcomes                       Acceptable Outcomes
Environment, heritage and scenic amenity
PO11 Development does not          AO11.1 Development does not result in           N/A
       have a significant                 sediment, soil or other material
       adverse impact on the              including building materials or
                                          waste products being released
       natural values of the
                                          into the road reserve, stormwater
       site including through:            drains, waterways or adjacent
       (a)    loss of biodiversity        properties.
              values, fauna
              habitat and fish
              passage;
       (b)    changes to natural
              drainage;
       (c)    disturbance to any
              wetland systems;
       (d)    erosion and the
              transport      of
              sediments     off
              site (including
              pollutants and
              other
              contaminants
              which      would
              affect       the
              capacity       of
              agricultural
              lands);
       (e)    worsening of
              landslide or fire
              risk;
       (f)    on­site effluent
              disposal;
       (g)    creation of dust and
              air pollutants;
       (h)    disturbance of
              buildings and
              features, including
              natural features, of
              cultural heritage
              significance.
                                     AO11.2 Natural Vegetation is retained
                                            wherever possible.



                                            Where there is a nominated building
                                     AO11.3 envelope on the lot, clearing of
                                            native vegetation and building works
                                            do not extend beyond the building
                                            envelope, except for the purposes
                                            of a driveway access.




                                                                                         15 | P a g e
Log in to download the original file

Planning Report.pdf · 728 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.