                    Appendix B – Response to Planning Codes




30 September 2021                            Chris Bentley
Ref: 20-052          Planning Report – Proposed Dwelling at 11 Senegal Rise, Doonan
Log in to download the original file

Response to Planning Codes - 11 Senegal.pdf · 454 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 15 pages

Page 2

Rural Residential Zone Code (AO1.2, AO2, AO5, AO6, AO8, AO10, AO11)                                                                       Compliance column key:
                                                                                                                                          ✔         Complies
                                                                                                                                          P/S       Performance solution
                                                                                                                                          N/A       Not applicable

Table 6.8.4.3 – Criteria for assessment
 Performance Outcomes                                     Acceptable Outcomes                                       Compliance   Comments
 Role and function
 PO1      Development provides for low density,     AO1.2      The dwelling house may include one secondary              ✔       Complies AO1.2
          semi-rural living as well as compatible              dwelling with a maximum gross floor area of                       The proposed development can comply with Council’s
          work from home opportunities, primary                                                                                  acceptable outcome.
                                                               65m2 and no more than two bedrooms.
          production and small scale visitor
          accommodation, on large allotments                                                                                     .
          with varying levels of services.
 PO2      Development does not result in the        AO2        A distance of not less than 100 metres is provided        ✔       Complies AO2
          diminished productive capacity of rural              between a sensitive land use and land within the                  The site is not located in proximity to land within the
          activities on adjacent or nearby                                                                                       rural zone.
                                                               Rural zone that:
          properties.
                                                                (a)    is mapped as Agricultural Land
                                                                       Conservation Area on the Agricultural
                                                                       Land Overlay maps in Schedule 2; and
                                                                (b)    has a property area greater than 4
                                                                       hectares.
 Built form
 PO5       Building height and scale                AO5.1      Buildings and structures are no more than 8               ✔       Complies AO5.1 – AO5.4
           Buildings and other structures:                     metres in building height from ground level,                      The proposed dwelling housing and will comply with
                                                               providing that they may be up to 9 metres where                   Council’s height requirements and the gross floor area
           (a)    are low rise;
                                                               the pitched roof but no other part of the building                of all structures will not exceed 500m2.
           (b)    do not present an                            or structure exceeds 8 metres.
                  appearance of bulk to
                  adjacent properties, roads        AO5.2      Where excavation is required, the maximum
                  or other areas in the                        portion of the exposed external façade of the
                  vicinity of the site;                        building cannot exceed 8 metres in building
           (c)    have a low site impact to                    height.
                  maximise the opportunity to
                  retain natural site                          Editor's note—refer to figure AP3-13A
                  characteristics, such as native


30 September 2021                                                                         Chris Bentley
Ref: 20-052                                                       Planning Report – Proposed Dwelling at 11 Senegal Rise, Doonan

Page 3

 Performance Outcomes                                      Acceptable Outcomes                                            Compliance   Comments
                vegetation and natural                 AO5.3     Site cover of all buildings and structures on the
                landforms;                                       site does not exceed 30%.
          (d)    respect the scale of
                 surrounding vegetation; and                      Alternative provision to the QDC

          (e)    are no more than two storeys                     Individual buildings or roofed structures do not
                                                       AO5.4
                 in height.                                       cover more than 500m2 of the site.

                                                                  The total gross floor area of all buildings on site
                                                       AO5.5
                                                                  does not exceed 500m2.

 PO6     Boundary setback                              AO6.1      Buildings used to house animals, temporary holding           ✔       Complies PO6
         Buildings and other structures are                       yards, structures containing areas of animal waste                   The proposed dwelling achieves well in excess of the
         designed and sited to:-                                  or by--product disposal are not within 100 metres                    nominated minimum 15m setback from Livistona Park
         (a) provide a high level of amenity to                   of:                                                                  to the south.
              users of the subject site and                       (a) the boundary of another property in the rural
              adjoining premises, including                            residential zone or any other residential zone;                 The dwelling house requires Council’s dispensation for
              provision of visual and acoustic                    (b) an existing dwelling on an adjoining property;                   a 8m setback from the eastern property boundary due
              privacy, access to breezes and                      (c) the boundary of adjoining properties in the                      to the following:
              protection from noise, odour or                          environmental management and conservation                       •    The cul-de-sac head on Senegal Rise terminates
              artificial lighting;                                     zone; or                                                             some 10m from the property frontage, resulting in
         (b) provide adequate distance from                       (d) a waterway or wetlands as shown on the                                a perceived setback of at least 18 metres from the
              adjoining land uses and avoid                            Biodiversity, Waterways and Wetlands Overlay                         road. The Senegal Rise frontage is only 20m in
              conflict with existing or future rural                   maps in schedule 2.                                                  width, with the balance of the eastern boundary to
              uses and activities on adjoining                                                                                              the site fronting the access handle on Lot 123.
              properties;                              AO6.2      Buildings or structures which are used for the                       •    The encroachment is associated with an alfresco
         (c) allow for space and landscaping to                   storage of chemicals or machinery, stockpiling of                         area which only encroaches marginally by 2m.
              be provided between buildings;                      composting or organic fertilisers, or which support                  •    The current site is 1.056 hectares in area and is
         (d) preserve existing vegetation that                    artificial lighting or irrigation sprayers, are not                       only just greater than the 1ha threshold for 6
              will help buffer development;                       within 100 metres of:                                                     metre setbacks. Allotments to the south and the
         (e) protect the natural character and                    (a) the boundary of another property in the Rural                         east all comprise allotments less than 1ha in area,
              avoid adverse impacts on                                  residential zone or any other residential zone;                     enabling the 6m setback to apply.
              ecologically important areas such                   (b) a dwelling on an adjoining property;                             •    Residential construction on the majority of
              as national parks, waterways and                    (c) the boundary of adjoining properties in the                           properties to the east along Senegal Rise have
              wetlands.                                                 Environmental management and conservation                           adopted a 6m setback from the road frontage,
                                                                        zone; or                                                            establishing the amenity characteristic in the area.
                                                                  (d) waterway or wetlands shown on the                                •    The setback to the access handle to Lot 123 is
                                                                        Biodiversity, Waterways and Wetlands Overlay                        visibly screened by existing vegetation and the
                                                                        maps in schedule 2.

30 September 2021                                                                             Chris Bentley
Ref: 20-052                                                           Planning Report – Proposed Dwelling at 11 Senegal Rise, Doonan

Page 4

 Performance Outcomes                                 Acceptable Outcomes                                            Compliance   Comments
                                                  AO6.3     Roadside stalls no larger than 9m2 may be located                        long driveway servicing the allotments to the
                                                            adjacent to the front property boundary provided                         north. The access handle is approximately 20m
                                                            safe space for parking of vehicles is also within the                    wide, and therefore, any vista available from
                                                            property boundary.                                                       allotments to the east will be occluded by distance
                                                                                                                                     and vegetation, resulting in no discernible impact
                                                  AO6.4      Outside the circumstances of AO6.1, AO6.2 and                           as a result of the 2m reduction in setback.
                                                             AO6.3 above, buildings and structures meet the                       •  The reduced setback will assist in retaining
                                                             following minimum boundary setbacks:                                    additional vegetation that would otherwise be lost
                                                             (a) 15 metres from a property boundary adjoining                        in the large remnant area at the rear of the
                                                                  land in the Environmental management and                           allotment that adjoins Livistona Park.
                                                                  conservation zone;
                                                             (b) 40 metres from mean high water spring of a                       The location of the proposed shed will encroach on the
                                                                  waterway or as otherwise prescribed through                     northern property boundary setback of 10m to achieve
                                                                  the Queensland Government Erosion Prone                         a setback of 3m and is justified on the following basis:
                                                                  Area Maps;                                                      •    The setback will be consistent with the setback of
                                                             (c) 10 metres from the road frontage;                                     approximately 2.5m adopted by the existing
                                                             (d) 10 metres from the side and rear boundaries                           residence on the adjacent Lot 121 to the north.
                                                                  or 6 metres where the lot area does not exceed                  •    The location will enable screening and create a
                                                                  1 hectare, with the exception that if the height                     sound barrier between the new residence and the
                                                                  of the building or structure exceeds 9 metres                        existing residence while enabling the retention of
                                                                  the setback to the side and rear boundaries is                       vegetation along the property boundary and
                                                                  equal to twice its height in metres.                                 opportunity for supplementary planting to occur
                                                                                                                                       to facilitate additional screening.
                                                             Alternative provision to the QDC                                     •    The shed will not be visible from the road frontage
                                                                                                                                       and will comply with setbacks from the road
                                                                                                                                       frontage and other allotments.
 Safety and Amenity
 PO8      Sports courts                           AO8.1      A 2 metre landscaped buffer separates any private           N/A      The application for the proposed dwelling house does
          Lighting and noise associated with                 tennis court, half court or sports court from side                   not include provision for a tennis courts.
          outdoor tennis courts, half courts or              property boundaries where adjoining land in a
          sports courts do not have an adverse               residential zone.
          impact upon the amenity enjoyed by
          occupants of adjoining or nearby        AO8.2      Courts are fenced to a height of—
          premises nor cause unreasonable                    (a) 3.6 metres for a full-sized court; or
          disturbance to the local fauna.                    (b) 2.4 metres for a half court.

                                                  AO8.3      Courts are not lit; or

                                                  AO8.4      For lit courts:

30 September 2021                                                                       Chris Bentley
Ref: 20-052                                                     Planning Report – Proposed Dwelling at 11 Senegal Rise, Doonan

Page 5

 Performance Outcomes                                  Acceptable Outcomes                                          Compliance   Comments
                                                             (a) lighting structures are not more than 8 metres
                                                                  in height and set back at least 2 metres from
                                                                  any property boundary;
                                                             (b) the court is located at least 60 metres from the
                                                                  external wall of an existing or approved
                                                                  residential dwelling on an adjacent or nearby
                                                                  lot (as measured from the centre line of the
                                                                  court);
                                                             (c) the vertical illumination resulting from direct,
                                                                  reflected or other incidental lighting
                                                                  emanating from the site does not exceed 8 lux
                                                                  when measured at any point 1.5 metres
                                                                  outside the boundary and at any level from
                                                                  ground level upward; and
                                                             (d) lighting is hooded or baffled to direct lighting
                                                                  downward or is of a type that gives no upward
                                                                  component of light when mounted
                                                                  horizontally.

 Scenic amenity
 PO10     Development does not detract from         AO10     Development on land adjoining the major road               N/A      Not Applicable
          the scenic amenity of the hinterland as            network, Lake Macdonald or the Noosa River                          The proposed development does not adjoin any of the
          experienced from the major road                    system minimises visual impacts on the scenic                       major view corridors or vantages listed in AO10.
          network or the waterways.                          amenity of the roadway or waterway by—
                                                             (a) sensitive siting and design of buildings,
                                                                  structures, driveways and works;
                                                             (b) retaining existing vegetation;
                                                             (c) incorporating landscape treatments to
                                                                  visually screen and soften development; and
                                                             (d) incorporating building materials and external
                                                                  finishes that are compatible with the site’s
                                                                  visual character and landscape setting..
 PO11     The landscape character and visual        AO11.1   To protect scenic amenity and other landscape               ✔       Complies AO11.1 – AO11.4
          amenity quality of hillslopes and                  qualities:                                                          The proposed dwelling house is located on the flattest
          ridgelines are retained and                        (a) buildings or structures are not constructed on                  land within the eastern extent of the allotment and
          development:                                            land with a slope greater than 33%; and                        seeks Council permission to encroach into the 10m
          (a) is visually responsive to the                  (b) buildings or structures are only constructed                    nominated setback to maximise use of the flatter land.
               natural topography of the site,                    on steep slopes if:                                            Cut and fill will be limited and construction materials
                                                                                                                                 will reflect site constraints.

30 September 2021                                                                        Chris Bentley
Ref: 20-052                                                      Planning Report – Proposed Dwelling at 11 Senegal Rise, Doonan

Page 6

 Performance Outcomes                                 Acceptable Outcomes                                           Compliance   Comments
             sitting within the landscape rather                 i) there are no other suitable building sites
             than dominating it;                                     on the property; and
         (b) retains natural vegetation that                     ii) construction utilises suspended floors or
             assists in screening or visually                        pole footings rather than slab on ground
             softening development;                                  construction.
         (c) steps down slopes or uses
             suspended floor construction,         AO11.2   On sloping sites or on ridgelines at the uppermost
             minimising cut or fill; and                    edge of a hill slope:
         (d) uses materials, finishes and                   (a) roof lines are generally parallel with contours
             colours that complement the                         of the land;
             natural setting and integrate with             (b) roofs do not exceed a pitch of 15 degrees;
             the landscape and skyline.                     (c) buildings do not protrude above the height of
                                                                 prevailing vegetation; and
                                                            (d) undercroft areas exceeding 1.5 metres in
                                                                 height are screened with landscaping or
                                                                 battens.

                                                            Editor's note—refer to Figure 6.9.1A and Figure
                                                            6.9.1B and Figure AP3-3B.

                                                   AO11.3   On sloping sites:
                                                            (a) cut or fill is less than 1.5 metres in depth
                                                                 relative to natural ground level; and
                                                            (b) slab on ground construction is avoided and
                                                                 split-level buildings with small floorplates are
                                                                 used as an alternative. Post and beam
                                                                 construction or suspended or pole
                                                                 construction techniques may be appropriate.

                                                   AO11.4   On sloping sites or on ridgelines at the uppermost
                                                            edge of a hill slope, buildings:
                                                            (a) are constructed in lightweight materials such
                                                                 as timber or board, stainless steel, glass and
                                                                 corrugated iron;
                                                            (b) are finished with exterior colours of moderate
                                                                 to darker shades of olive green, brown, green,
                                                                 blue, charcoal or wood stains that blend with
                                                                 the colour and hues of the surrounding
                                                                 vegetation and landscape;


30 September 2021                                                                      Chris Bentley
Ref: 20-052                                                    Planning Report – Proposed Dwelling at 11 Senegal Rise, Doonan

Page 7

 Performance Outcomes   Acceptable Outcomes                                  Compliance      Comments
                              (c) avoid large expanses of solid colours or
                                   reflective surfaces.




30 September 2021                                        Chris Bentley
Ref: 20-052                      Planning Report – Proposed Dwelling at 11 Senegal Rise, Doonan

Page 8

Low Density Housing Code (AO2.1, AO3, AO5 – AO12)                                                                                         Compliance column key:
                                                                                                                                          ✔        Complies
                                                                                                                                          P/S      Performance solution
                                                                                                                                          N/A      Not applicable

Table 9.3.1.3 – Criteria for assessment
 Performance Outcomes                                     Acceptable Outcomes                                       Compliance   Comments
 Effects of Use
 PO2       Removal homes                            AO2.1      Any part of a removal home that is affected by           N/A      The proposed development is for a dwelling house.
           A removal home—                                     termite attack, borers, dry rot or severe
         (a) does not have an adverse                          weathering or is damaged as a consequence of
             impact on the amenity of                          relocation, is repaired or replaced using new or
             the premises or                                   sound second-hand materials.
             surrounding premises;
             and
         (b) maintains the safety of
              people and property.
 PO3     Housing choice                             AO3        A secondary dwelling:                                    N/A      The proposed development is not for a secondary
         A secondary dwelling:                                                                                                   dwelling however in the event that a secondary
                                                                (a)    has a maximum gross floor area of 65m²;
                                                                                                                                 dwelling is proposed at a later date, compliance with
          (a)   forms part of a dwelling
                                                                (b)    has no more than 2 bedrooms;                              AO3 can be achieved.
                house and is not subdivided
                from the balance of the                         (c)    does not occur on any property
                dwelling house;                                        covered by a Building Unit Plan; and
          (b)   contributes to housing                         does not occur on a property that already contains
                choice for members of                          a dual occupancy or secondary dwelling.
                the one household;
          (c)   protects the low density
                residential, rural residential or
                rural character of the zone;
          (d)   does not occur on a
                property covered by a
                Building Unit Plan or any
                property already
                containing more than


30 September 2021                                                                         Chris Bentley
Ref: 20-052                                                       Planning Report – Proposed Dwelling at 11 Senegal Rise, Doonan

Page 9

 Performance Outcomes                                        Acceptable Outcomes                                          Compliance   Comments
                   one dwelling;
           is accompanied by       sufficient    car
           parking.
 Building design and services
 PO5      Service and utilities                        AO5.1      If located within the urban boundary, the                            Complies AO5.2
          Development is provided with:
                                                                                                                             ✔         The subject site is not within the urban boundary and
                                                                  dwelling is connected to reticulated water
                                                                                                                                       will include rainwater tanks compliant with AO5.2 and
           (a)   a level of infrastructure and                    supply, sewerage, stormwater drainage and
                                                                                                                                       on-site effluent treatment and disposal system will be
                 services that is appropriate                     telecommunications infrastructure networks                           provided to accord with AO5.3.
                 to its setting and sufficient                    (where available to the lot).
                 for the intended use;
           (b)   an effluent treatment and                        Editor’s Note—the urban boundary is indicated
                 disposal system that does                        on the zone maps contained within Schedule 2.
                 not have an adverse effect
                 on ecologically important                        Where there is no reticulated water supply, the
                                                       AO5.2
                 areas or water quality; and                      premises is serviced with a rainwater tank with
                                                                  the following minimum water supply capacity:
           (c)   adequate onsite water
                                                                   (a)    for dwellings with no more than 3
                 storage to support the                                   bedrooms – 45,000 litres; or
                 efficient use of water and
                                                                   (b)    for dwellings of more than 3 bedrooms
                 is adequate for everyday
                                                                          or where including a secondary
                 use of the occupants
                                                                          dwelling on the same premises –
                                                                          60,000 litres.

                                                       AO5.3      If located on a lot where reticulated sewerage is not
                                                                  available to the lot, the dwelling is connected to an
                                                                  on-site effluent treatment and disposal system.

 PO6      Landscaping                                  AO6        Soft landscaping is provided and retained to a                       Complies AO6
          Buildings and structures allow for                      minimum of 20% of the site area.
                                                                                                                             ✔         The proposed dwelling house will maximise retention of
          sufficient space for outdoor activities,                                                                                     vegetation on the balance of the property. Landscaping
          garden areas and screening to                                                                                                will be completed for areas to be cleared around the
          surrounding land uses.                                                                                                       residence.
 PO7      Car parking                                  AO7        Car parking is provided in accordance with Table                     Complies AO7
          Sufficient car parking is provided to                   9.4.1.4 of the Driveways and parking code.
                                                                                                                             ✔         Sufficient area for car parking will be available on site.
          accommodate the number of vehicles
          likely to use the site.


30 September 2021                                                                            Chris Bentley
Ref: 20-052                                                          Planning Report – Proposed Dwelling at 11 Senegal Rise, Doonan

Page 10

 Performance Outcomes                                    Acceptable Outcomes                                         Compliance   Comments
 Driveway and crossover
 PO8      Access design                            AO8.1       Driveways and crossovers are designed to comply                    Complies AO8.1 – 3
                                                                                                                        ✔         A crossover point and driveway will comply with IPWEA
          The design, management and                           with Council's standard drawings RS-049, RS-050,
          maintenance of the access                                                                                               Standard Drawing RS-049 and RS-050.
                                                               RS-056 and addendum as applicable.
          facilitates:
          (a)   safe and convenient use            AO8.2      Where a footpath exists, the driveway meets the
                for vehicles, pedestrians                     road reserve at the level of the existing footpath.
                and cyclists;
          (b)   vehicles negotiating
                without contacting the             AO8.3       Driveways within the property:
                driveway or crossover
                                                               (a)    have a maximum gradient of 20%
                surface; and
                                                                      and vertical curves to ensure no
          (c)   stormwater disposal                                   scraping for a standard vehicle; or
                without any negative
                impacts on the                                 (b)    have a maximum gradient of 25%
                surrounding area.                                     provided–
                                                                       (i)    the length of the driveway
                                                                              steeper than 20% does not
                                                                              exceed 6 metres; and
                                                              there is a change in gradient not less than 2 metres
                                                              in length and not greater than 12:5% at the ends of
                                                              the 25% section of the driveway.

 PO9     The driveway and crossover design         AO9        The driveway and crossover is designed without                      Complies AO9
         avoids using structures within the road
                                                                                                                        ✔         A driveway and crossover will not require significant
                                                              significant alteration to the existing road reserve
         reserve.                                                                                                                 alteration to the road.
                                                              whereby the finished surface level of the
                                                              driveway is consistent in height with the existing
                                                              height of the road reserve.

                                                              Editor’s Note—Should the design not comply with
                                                              the standard drawings, including any cut or fill
                                                              within the road reserve, an operational works
                                                              application to Council for a non-standard driveway
                                                              is required.




30 September 2021                                                                        Chris Bentley
Ref: 20-052                                                      Planning Report – Proposed Dwelling at 11 Senegal Rise, Doonan

Page 11

 Performance Outcomes                                    Acceptable Outcomes                                         Compliance   Comments
 PO10    Materials                                    AO10     No pavers or permeable pavement systems are                        Complies AO10
         Driveways and crossovers are to be able
                                                                                                                        ✔         Development will not result in pavers or permeable
                                                               used within the road reserve.
         to withstand loadings from vehicles and                                                                                  systems in the road reserve.
         the use of pavers is avoided.
                                                                Editor’s Note—Examples of the types of pavers to
                                                                avoid include clay, concrete and permeable
                                                                pavement products.
 PO11     Surface water                               AO11      Driveways have a minimum grade of 1% away                         Complies AO11
          Driveways are designed to:
                                                                                                                        ✔         The driveway and crossover will fall toward Senegal
                                                                from any adjoining buildings and are formed to
                                                                                                                                  Rise.
          (a)     prevent water from ponding or                 drain to landscaped areas.
                  entering buildings;
          (b)     provide an opportunity for
                  filtering of stormwater
                  prior to it leaving the site;
                  and
          (c)     not reduce the stormwater
                  carrying capacity of
                  roadways.
 PO12     Protection of infrastructure                AO12      Driveways are located not less than 1.0 metre from       N/A      There is no stormwater infrastructure at the terminus
          Driveways do not damage or interfere                  stormwater infrastructure.                                        of Senegal Rise.
          with the location, function of, or access
          to Council infrastructure.
                                                                Editor’s Note—If the driveway covers or is
                                                                within 1.0 metre of stormwater infrastructure,
                                                                an operational works application to Council for
                                                                a non-standard driveway is required.
 PO13     Streetscape and effect on traffic           AO13.1    Areas adjoining driveways disturbed as a                          Complies AO13.1
          network
                                                                                                                        ✔
                                                                result of the driveway construction are
          The visual impact of driveways on the
                                                                grassed or planted to minimise visual impact
          streetscape and surrounding area is
          minimised and significant adverse                     and stabilise the soil.
          impacts on the traffic network are
          avoided.                                    AO13.2    Vehicular access avoids disturbance to the tree
                                                                protection zone of trees on public land.




30 September 2021                                                                          Chris Bentley
Ref: 20-052                                                        Planning Report – Proposed Dwelling at 11 Senegal Rise, Doonan

Page 12

 Performance Outcomes                                  Acceptable Outcomes                                           Compliance   Comments
 PO14    Driveways and crossovers are located so    AO14.1   Only one driveway and crossover is provided.                         Complies AO14.1 and AO14.4
         they do not impede the safe and
                                                                                                                        ✔
         efficient use of the road network.         AO14.2     Where the premises has frontage to more than
                                                               one formed and sealed road and the roads have
                                                               differing orders in the Road Hierarchy, the
                                                               driveway and cross-over is provided on the
                                                               frontage with the lower order.

                                                    AO14.3     For corner lots, driveways and crossovers are
                                                               located in accordance with Council's standard
                                                               drawings.

                                                    AO14.4     If in the Rural zone or Rural Residential zone, the
                                                               driveway and cross-over is located to provide
                                                               minimum safe sight distances in accordance with
                                                               Austroads.

                                                              Editor's Note - An operational works application
                                                              is required for a second driveway.
 PO15     Bushfire hazard management                AO15      Within a bushfire hazard area where there is no                     Complies AO15
          Where located in a Bushfire Hazard
                                                                                                                        ✔         An additional water storage or pool will be provided
                                                              reticulated water supply, the premises has:
          Area as shown on the Bushfire Hazard                                                                                    with any residence in compliance with Council’s code.
          Overlay Map in Schedule 2 and not in a               (a)    an accessible dam, swimming pool or
          water service area, an adequate,                            water tank available for firefighting
          reliable, safely located and freely                         purposes with an onsite water volume of
          accessible water supply is provided for                     not less than 5,000 litres; and
          fire fighting purposes, which is in                  (b)    a water supply outlet pipe 50
          addition to day to day water supply.                        millimetres in diameter and fitted with
                                                                      a standard fire brigade fitting
                                                                      connected to the water supply (other
                                                                      than where the water supply is in a
                                                                      swimming pool or dam).

                                                              Editor’s Note — Water supply capacity for
                                                              firefighting purposes is in addition to water
                                                              supply capacity for household use.



30 September 2021                                                                        Chris Bentley
Ref: 20-052                                                      Planning Report – Proposed Dwelling at 11 Senegal Rise, Doonan

Page 13

 Performance Outcomes                                  Acceptable Outcomes                                           Compliance   Comments
 PO16    Flood hazards                              AO16.1   Where the development is located in the Flood              N/A       The area of the proposed development is not affected
         Development is designed and sited to                Hazard Area as shown on Flood Hazard Overlay                         by Council’s Flood hazard overlay.
         ensure risk to people and property from             Map in Schedule 2,
         flooding is avoided or minimised.                   the finished floor level of habitable rooms is at
                                                             least 300 millimetres above the Defined flood
                                                             event (DFE).

                                                               OR

                                                               Where the DFE has not been modelled for the
                                                    AO16.2
                                                               area, the finished floor level of habitable rooms
                                                               is at least 500 millimetres
                                                               above the highest recorded flood.

                                                               Editor's Note—The QDC mandatory provisions
                                                               MP3.5 also apply to the construction of
                                                               buildings in flood hazard areas.
 PO17     Underground car parking areas are                    No acceptable outcome provided                            N/A      No underground car parking is proposed.
          designed to drain and function safely
          during a flood event and power failure.

          Editor's note—Basements should have
          flood immunity above the 1%AEP
          defined flood event with alternative
          means to mechanical pumping used to
          achieve such immunity.
 PO18     Major electricity infrastructure &        AO18       Development including any sensitive land uses is at                Complies AO18.1-2
          substations
                                                                                                                        ✔         The subject site is not within 30m from a transmission
                                                               least:
          Development is sufficiently separated                                                                                   line easement.
          from major electricity infrastructure                 (a)    50 metres from a transmission
          and substations to minimise the                              substation;
          likelihood of nuisance or complaint.                  (b)    10 metres from any other substation; and
                                                                (c)    30 metres from a transmission line
                                                                       easement.


                                                    AO18.2     Habitable buildings are not located within an
                                                               easement for a distribution line.


30 September 2021                                                                           Chris Bentley
Ref: 20-052                                                         Planning Report – Proposed Dwelling at 11 Senegal Rise, Doonan

Page 14

 Performance Outcomes                                  Acceptable Outcomes                                        Compliance   Comments
 PO19    Development is located and designed to     AO19     Noise emissions do not exceed 5db(A) above                        Complies AO19
         avoid or minimise noise nuisance from
                                                                                                                     ✔         The proposed development is for a dwelling house, and
                                                             background noise level internal to a habitable
         the use of infrastructure.                                                                                            will not exceed the standard noise emissions for a
                                                             building measured in accordance with AS1055.
                                                                                                                               domestic dwelling.

 PO20    Wherever       practicable     habitable   AO20      Where adjoining substations or major electricity        N/A
         buildings are orientated to avoid direct             infrastructure, habitable buildings are
         overlooking of major electricity
                                                              orientated so that the majority of outdoor living
         infrastructure or substations.
                                                              areas and windows of habitable rooms face
                                                              away from the infrastructure.
 PO21    Earthworks and drainage                    AO21      Filling other than accessways:                                   Complies AO21
                                                                                                                     ✔         No significant cut and fill is proposed on the site that
         Earthworks and drainage
                                                               (a)    does not extend more than the equivalent                 will exceed the parameters provided in AO21.
         operational works do not directly,                           of 3 metres around the main building,
         indirectly or cumulatively cause                             measured from the outer walls of the
         adverse impacts external to the                              building;
         development site by:
                                                               (b)    is limited to a maximum of 500m2;
          (a)    causing ponding of water on
                 the site or nearby land;                             and does not impact on the local drainage
                                                                      of adjoining properties.
          (b)    increasing flooding, which
                 adversely affects the
                 safety or use of any land
                 upstream and
                 downstream;
          (c)    adversely affecting the flow
                 of water in any overland flow
                 path; and
          (d)    adversely affecting the privacy
                 or visual amenity of
                 surrounding property.

         Editor's Note—Development should
         ensure that filling does not impact on
         the amenity and usability of
         neighbouring properties (including loss


30 September 2021                                                                         Chris Bentley
Ref: 20-052                                                       Planning Report – Proposed Dwelling at 11 Senegal Rise, Doonan

Page 15

 Performance Outcomes                                   Acceptable Outcomes                                       Compliance   Comments
         of privacy caused by relative level
         changes) or offsite drainage.
 PO22    Landslide hazard area                       AO22.1   Development, including associated access, is                     Complies AO22
         Development maintains the safety of
                                                                                                                     ✔         The majority of the location of the dwelling house is
                                                              not located on land identified as a landslide
         people, property and hazardous                       hazard area on a Landslide Hazard Overlay Map.                   outside of the area affected by the Landslide hazard
         materials stored in bulk from the risk of                                                                             overlay. The western extent of the dwelling house may
         landslide.                                                                                                            extend into the land affected by the Landslide hazard
                                                     AO22.2   Development, including associated access, is
                                                                                                                               overlay and has been subject to an assessment by a
                                                              located outside moderate, high and very high
                                                                                                                               geotechnical engineer. A low risk of landslip through
                                                              landslide hazard areas and areas with 15% slope
                                                                                                                               shallow slumping or creep of surface was ascribed to
                                                              or greater, as determined by a site-specific
                                                                                                                               the site. A copy of this assessment has been included
                                                              slope- analysis.
                                                                                                                               as Appendix C of this report.

                                                              OR

                                                              A site-specific geotechnical assessment is
                                                     AO22.3
                                                              prepared by a registered professional
                                                              engineer to certify that:
                                                              (a)    the stability of the site, including
                                                                     associated buildings and infrastructure,
                                                                     will be maintained and operational for the
                                                                     life of the development;
                                                              (b)    the site is not subject to the risk of
                                                                     landslide activity originating from other
                                                                     land, including land above the site; and
                                                              (c)    development of the site will not
                                                                     increase the risk of landslide
                                                                     activity on other land.

                                                              Editor's Note— PSP8 Natural Hazards provides
                                                              further guidance on assessing landslide hazard.

                                                              Any specific measures identified in a site
                                                              specific geotechnical assessment for stabilising
                                                              the site or development are to be fully
                                                              implemented.



30 September 2021                                                                       Chris Bentley
Ref: 20-052                                                     Planning Report – Proposed Dwelling at 11 Senegal Rise, Doonan

Page 16

 Performance Outcomes      Acceptable Outcomes                                 Compliance      Comments


                        AO22.4




30 September 2021                                          Chris Bentley
Ref: 20-052                        Planning Report – Proposed Dwelling at 11 Senegal Rise, Doonan

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.