SPA Decision Notice - 010.2010.00000627.001 [As Published] · 152010.627

of 18

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                                 Officer:          Tracy Jones
                                                 Direct Telephone: (07) 5449 5228
                                                 Response Address: Locked Bag 72
                                                                   Sunshine Coast Mail Centre QLD 4560
                                                 Email:            [email protected]
                                                 Our Reference:    2010/627
                                                 Your Reference:   M2358-02-02


15 September 2010


Scanlon Property Group
CARE Jones Flint & Pike Pty Ltd
PO Box 6
MAROOCHYDORE QLD 4558



Dear Sir / Madam

                                        Decision Notice
                                    Sustainable Planning Act 2009

I refer to your application and advise that on 13 September 2010 Council decided to approve the
application in full subject to conditions.
Details of the decision are as follows:

1        APPLICATION DETAILS

    Application No:                    2010/627
    Street address:                    215, 215A, 217 & 219 David Low Way PEREGIAN BEACH
    Real property description:         Lots 8, 9 & 10 P9315 and Lot 76 MCH 2969
    Planning Scheme:                   The Noosa Plan

2        DECISION DETAILS
The following type of approval has been issued:
        Development Permit for Reconfiguring a Lot - 4 lots into 1 lot into 3 lots

3        RELEVANT PERIOD OF APPROVAL
The relevant period for this development approval is identified in the Assessment Manager conditions.

4        ASSESSMENT MANAGER CONDITIONS
Approved Plans
1.       Development undertaken in accordance with this approval must generally comply with the
         approved plans of development. The approved plans are listed in the following table and as
         may be amended by these conditions.

           Plan / Document No.         Issue.     Plan / Document Name                     Date
           M2358-03 Sheet 1 of 1                  Reconfiguration Plan prepared by         17 March 2010
                                                  Jones Flint & Pike



                                                                                            Page 1 of 18
Full text of the other 17 pages

Page 2

                                                                                          2010/627




Plan of Survey
2.   In conjunction with the lodgement of the Plan of Survey for Council endorsement, legal
     documentation must be presented to Council and must be submitted in the correct form with
     the fees prescribed in Council's adopted fee schedule.
3.   All outstanding rates and charges due and payable to Sunshine Coast Regional Council in
     respect of the lots being reconfigured must be paid prior to endorsement of the Survey Plan.
4.   Any changes required by Council’s Solicitor must be attended to prior to endorsing the Plan of
     Survey. Any necessary Titles Office forms requiring the consent of Council is to be submitted
     prior to the endorsing of the Plan of Survey.
Parkland Restoration and Dedication
5.   Upon registration of the Plan of Survey, the relevant land required to be dedicated for park
     purposes, as indicated on drawing M2358-03 Sheet 1 of 1 (and as may be amended by
     findings from other conditions of this Permit), shall be dedicated to the Crown (with Council as
     Trustee) for park and environmental protection purposes pursuant to the Land Act 1994 at no
     cost to Council.
6.   An Ecological Restoration Plan for the Parkland shall be prepared in accordance with the
     requirements of Council’s Planning Scheme Policy PSP18 Ecological Assessment Guidelines
     and submitted for Council approval prior to sealing the plans of survey. The park areas of the
     site shall be revegetated and rehabilitated in accordance with the Council approved Ecological
     Restoration Plan.
7.   The Ecological Restoration Plan shall be prepared by a qualified and experienced Ecologist, to
     the reasonable satisfaction of the Council. The Ecological Restoration Plan (ERP) shall be
     applicable to the portion of the site to be dedicated to Council as Parkland and address
     environmental weed removal and control, rehabilitation of existing vegetation communities and
     revegetation strategies for degraded areas of the area of the site to be dedicated as parkland.
     It shall identify all the areas of the park that require ecological restoration, specify actions and
     works necessary to result in robust, self-sustaining, viable indigenous plant communities and
     habitat. The ERP shall aim to revegetate the park areas with suitable native species to
     resemble the local endemic ecosystem by removing all noxious and environmental weeds
     from the site and include the planting and maintenance requirements of the Council approved
     Bushfire Management Plan for the site. The ERP shall detail continual maintenance
     requirements for a 1 year period (the maintenance period) to enable the revegetation and
     rehabilitation works to be self-maintaining.           To this extent Council’s Coordinator of
     Environment and Landscaping must be consulted during the preparation of the plan.
8.   The following, inter alia, shall be addressed and included in the Ecological Restoration Plan
     and specifications:
     8.1   document the current status of the areas requiring ecological restoration in terms of
           structure, floristics, missing elements, health, vigour, etc.;
     8.2   specify the required works and actions for each area in terms of:
     8.3   site preparation (this may include thinning, grass removal, weed removal and control,
           etc.);
     8.4   establishment of the missing floristic and structural elements;
     8.5   creating opportunities for regeneration from the seed bed, natural recruitment and the
           establishment of wildlings;
     8.6   habitat creation and reinforcement for native fauna and reinforcement of habitat
           linkages and corridors;
     8.7   planting and mulching procedures;
     8.8   fertilizing procedures;
     8.9   watering procedures;

                                                                                      Page 2 of 18

Page 3

                                                                                       2010/627




      8.10 protection from wildfire, particularly during the establishment phase;
      8.11 erosion and sediment control;
      8.12 on-going maintenance;
      8.13 access for maintenance;
      8.14 environmental safeguards; and
      8.15 incorporation of the relevant requirements of all the management plans required by this
           approval, particularly the Bushfire Management Plan and Koala Management Plan.
9.    All Class 1, Class 2 and Class 3 pest plants declared under the Land Protection (Pest and
      Stock Route Management) Act 2002 must be controlled on the entire site prior to Council
      endorsement of the plan of survey. In this context “controlled” shall mean, for class 1 and 2
      pests, completely eradicated. For class 3 pests it shall mean removal of the plants where they
      threaten environmentally significant areas of the site such as riparian zones and areas of
      natural vegetation.
10.   A wire fauna fence shall be erected around the perimeter of the park areas to be protected
      and restored, prior to construction activities commencing on site. The fauna fence will have
      signs attached restricting entry to authorised persons only.
11.   The contract for the Ecological Restoration work shall specify a 1 year maintenance period
      from the date restoration works are completed by the contractor to the reasonable satisfaction
      of the Council’s Coordinator of Environment and Landscaping, by which time the ecologically
      restored areas should be self-sustaining. It shall also be weed-free to the satisfaction of the
      Manager, Council’s Coordinator of Environment and Landscaping. The applicant must provide
      Council’s Coordinator of Environment and Landscaping with a certification from a suitably
      qualified person confirming that management of weeds within the park area complies with the
      requirements of the Land Protection and Stock Route Management Act.
12.   All the relevant ecological restoration works and actions shall be undertaken by the Developer
      and completed prior to dedication of the park areas to Council.
Easements
13.   The applicant shall create a volumetric easement for access purposes over Lot 1, in favour of
      Lot 2 for vehicular access and car parking purposes.
Power Supply
14.   An electricity service shall be provided to Lots 1 and 2.
15.   In this regard, an approved ENERGEX Electrical Design Consultant shall be engaged to
      prepare detailed designs of the electrical proposal.
16.   The detailed designs shall then be submitted to ENERGEX for approval and a copy of their
      approval submitted to SCRC in conjunction with a “Certificate of Electricity Supply for
      Proposed Subdivisions” (prepared by an approved ENERGEX Electrical Design Consultant)
      prior to SCRC endorsing the Plan of Survey.
17.   Any agreement with ENERGEX or an approved ENERGEX Electrical Design Consultant shall
      be wholly at the applicant’s expense and shall not entail a financial encumbrance on future
      purchasers of the proposed lots.
Telecommunications
18.   The requirements for TELECOMMUNICATION services shall be satisfied in relation to the
      provision of new telephone services to Lots 1 and 2. In this regard written confirmation from
      an approved telecommunication agency shall be submitted to the Council prior to Council
      endorsing the Plan of Survey.
Landscaping
19.   Existing trees on the site and within the road reserve are to be retained, except where required
      to be removed due to building operations or conduct the approved use.
                                                                                    Page 3 of 18

Page 4

                                                                                       2010/627




General
20.   The relevant period is four (4) years from the day this permit takes effect and ends on
      13 September 2012, during which time all conditions must have been compiled with, and the
      Plan of Survey lodged with Council for endorsement
21.   Any damage caused to any public utility during the course of construction shall be repaired to
      Council’s standards and at no cost to Council.
22.   Any alteration of any public utility or other facilities necessitated by the development of the
      land or associated construction works external to the site shall be at no cost to Council.
23.   The transportation of all materials to and from the site shall be undertaken in a manner such
      that no particle matter escapes onto a public road. All vehicles carrying materials either to or
      from the site shall be covered to prevent materials including dust being windblown from the
      vehicle.
Water and Sewerage
24.   Reticulated water must be provided to each lot in the development. This must include:
      24.1 Ensuring that existing internal water pipes are wholly contained within the lot they will
           serve.
      24.2 A new 150mm diameter DICL watermain must be constructed from the existing 100mm
           diameter AC watermain in David Low Way to the development, and for the full frontage
           of the development site. The works must be completed prior to placing construction
           materials or site offices adjacent to the water main alignment
      24.3 An approved water meter for each lot in accordance with Unitywater Standard Drawings
           SCW 350,355 and 360.
25.   Proposed lot 3 is to be dedicated council open space and is not subject to development and
      therefore water services will not be required.
26.   Reticulated sewerage must be provided to each lot in the development. This must include:
27.   Ensuring existing sewer house drains are wholly contained within the Lot they will serve.
28.   The existing 150mm sewer and manholes located within the development site is to be disused
      and a new sewer is to be constructed following a standard alignment to the property boundary
      and in accordance with the council planning scheme. These works are to be submitted with
      the associated operational works application.
29.   Proposed lot 3 is to be dedicated council open space and is not subject to development and
      therefore sewer services will not be required.
30.   Retaining walls running horizontally to sewer mains are to be 1.5m clear of the sewer.
      Retaining walls crossing the sewer are to be free standing and self supporting for a minimum
      of 1m both sides of the sewer main.
31.   The level of the existing sewer access chamber must be adjusted to suit the proposed finished
      surface levels. Work must be undertaken by Unitywater at the applicants cost.
32.   A minimum clearance of 1.5 metres must be maintained between Unitywater sewers and
      proposed building envelopes, buildings and other structures.
33.   A 3.0 metre wide easement must be provided over all Unitywater sewers located in private
      property. A 4.0 metre wide easement must be provided over Unitywater sewers greater than
      3.0 metres deep (where approved by Unitywater). Easements must be located centrally over
      the main.
34.   Written approval to enter and construct must be obtained from the owners of properties
      through which external sewers will traverse, and be submitted with lodgement of the
      associated development application for Operational Works


                                                                                    Page 4 of 18

Page 5

                                                                                         2010/627




35.   Stormwater retention systems and gross pollutant traps must maintain a minimum clearance
      of 1.5 metres from Unitywater water supply and sewerage infrastructure.
36.   Tree plantings must maintain a minimum horizontal clearance of 1.0 metre from Unitywater
      water mains and 1.5 metres from Unitywater sewerage mains. Landscaping plants within
      these clearances must be low growing when mature and suitable Unitywater approved
      varieties.
37.   Construction works undertaken in the vicinity of Unitywater water supply or sewerage
      infrastructure must not adversely affect the integrity of the infrastructure. All costs associated
      with repair, replacement or alteration of infrastructure must be met by the applicant.
38.   Connection to the Unitywater existing water supply and live sewerage system must be
      undertaken by Unitywater at the applicants cost. Please contact Unitywater for quotation.
Infrastructure Policy
39.   The applicant must pay contributions towards trunk infrastructure in accordance with the
      following Planning Scheme Policies and Council Policies:
      (a)   Planning Scheme Policy 12 – Public Open Space Contributions;
      (b)   Planning Scheme Policy 13 – Contributions in Lieu of Off Street Parking;
      (c)   Planning Scheme Policy 16 – Sewerage Headworks Contributions;
      (d)   Planning Scheme Policy 17 – Water Supply Headworks Contributions;
      (e)   Planning Scheme Policy 20 – Pathway Trunk Network Contributions;
      (f)   Council Policy – Rural Roadworks Contributions;
      (g)   Council Policy – Master Drainage Contributions.
40.   For material change of use of premises approvals the contributions must be paid prior to the
      commencement of use, for reconfiguring a lot approval contributions must be paid prior to
      Council approval of the plan of subdivision.
41.   The actual amount of the contribution must be calculated and paid in accordance with the
      Planning Scheme Policies and variations due to indexation current at the time of payment.

5     REFERRAL AGENCY CONDITIONS

The referral agencies applicable to this application are:

 Referral Trigger               Referral Status     Referral Agency      Referral Address
 Reconfiguring a lot – Land     Advice              DERM
 in or near a wetland                                                    Department of Environment
 Reconfiguring a lot – Land     Advice              DERM                 and Resource Management
 in or near a conservation                                               Ecoaccess Customer
 estate                                                                  Service Unit
                                                                         PO Box 15155
 Reconfiguration of a Lot -     Concurrence         DERM
                                                                         CITY EAST QLD 4002
 Contaminated land
 (unexploded ordnance)
 Development in Interim         Concurrence         DIP                  Department of Infrastructure
 Koala Habitat Protection                                                and Planning
 Area                                                                    PO Box 15009
                                                                         CITY EAST QLD 4002

A copy of any referral agency conditions is attached.




                                                                                      Page 5 of 18

Page 6

                                                                                            2010/627




6     APPROVED PLANS/DOCUMENTS

The approved plans and / or documents for this development approval are listed in the following table:

 Plan / Document No.           Issue.     Plan / Document Name                           Date
 M2358-03 Sheet 1 of 1                    Reconfiguration Plan prepared by Jones         17 March 2010
                                          Flint & Pike

7     ADVISORY NOTES

The following Advisory Notes are for information purposes only and do not form conditions of approval:
1.    The applicant is advised that a Compliance Permit for all plumbing and drainage works within
      the boundaries of the development site shall be obtained from Council’s Plumbing Services
      Section prior to obtaining a Development Permit for Building Works.
2.    An advice notice outlining the estimated infrastructure contributions payable and the basis for
      their calculation under the current Planning Scheme Policies and Council Policies is attached
      with this Development Permit.
3.    Please        contact      Council's     Infrastructure    Charges      Officer      (email:
      [email protected]) a minimum of 5 business days prior to payment of the
      infrastructure contributions and/or charge notice so a payment advice detailing the amounts
      applicable at the time of payment may be issued to accompany the payment.
4.    Payment of infrastructure contributions and/or infrastructure charge notices will not be
      accepted by credit card transaction.
Equitable Access and Facilities
The plans for the proposed building work have NOT been assessed for compliance with the
requirements of the Building Code of Australia – Part D3 as they relate to people with disabilities.
Your attention is also directed to the fact that in addition to the requirements of the Building Code of
Australia – Part D3 as they relate to people with disabilities, one or both of the following may impact
on the proposed building work:
(a)   The Disability Discrimination Act 1992 (Commonwealth)
(b)   Anti-Discrimination Act 1991 (Queensland)
Sunshine Coast Regional Council recommends that the following matters be considered to address
equitable access and facilities in the building:
(a)   The building and environs should be designed to meet the requirements of the Human Rights
      and Equal Opportunity Commission “Advisory Notes on Access to Premises” and AS 1428.2
(b)   Applicants should be aware that a “Disability Standard on Access to premises” is currently
      being developed and most likely will impose changes on the Building Code of Australia
(c)   Any services and facilities in the building complex should allow independent, dignified and
      equitable use of the services and facilities for all people.
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003.
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage.” It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the Act can
also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or
the cultural heritage value of Aboriginal cultural heritage.

                                                                                        Page 6 of 18

Page 7

                                                                                     2010/627




You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.

8      PROPERTY NOTES

Not applicable.

9      PRELIMINARY APPROVAL OVERRIDING SCHEME
Not applicable.

10     FURTHER DEVELOPMENT PERMITS REQUIRED

Not applicable.
11     SELF ASSESSABLE CODES

Not applicable.

12     SUBMISSIONS
Not applicable.

13     REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME
Not applicable.

14     RIGHTS OF APPEAL

You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Sustainable Planning Act 2009 is attached.
During the appeal period, you as the applicant may suspend your appeal period and make written
representations to Council about the conditions contained within the development approval. If
Council agrees or agrees in part with the representations, a “negotiated decision notice” will be
issued. Only one “negotiated decision notice” may be given. Taking this step will defer your appeal
period, which will commence again from the start the day after you receive a “negotiated decision
notice”. (Refer to Part 8 “Dealing with decision notices and approvals” - Division 1 “Changing
decision notices and approvals during applicant’s appeal period” of the Sustainable Planning Act
2009.)

15     OTHER DETAILS

Should you wish to obtain more information about Council’s decision electronic copies are available
on line at www.sunshinecoast.qld.gov.au, or at Council Offices.
Yours faithfully,




Kerri Coyle
Coordinator Planning Applications - North

Enc:    Appeal Rights
        Referral Agency Response
        Approved Plans/Documents
        Infrastructure Contributions Advice Notice


c.c     DERM -Ecoaccess Customer Service Unit
        PO Box 15155
        CITY EAST QLD 4002


                                                                                  Page 7 of 18

Page 8

                                       2010/627




Referral Agency Conditions
SUNSTAINABLE PLANNING ACT   2009   &   SUSTAINABLE
PLANNING REGULATION 2009




                                   Page 8 of 18

Page 9

   2010/627




Page 9 of 18


[OCR of page images]
2010/627

 

Notice
Concurrence Agency Response and Advice Agency Response

General advice to asaeaament manager

Pursuant to sectons 334 asd 363 of Me Act a copy of a decision actos of negotiated decision motos
tstued by he assessment manager must be forwarded to DERM as a referral agency for the relevant
apphcaton at PO Box 573, Nambour Od 4560

The State's Natve Title Work Procedures prowde that responsatubty for assessment of natee oe mssues
for an IDAS appbcaton rests with the assesament manager Therwlor, DERM as a ceferral agency for
the relevart apphoaton has not provided motficaden to natrve ide partes

Aboriginal Cattura! Heritage Act 2005
DERM also takes fs opportunty % advse the Assessment Manager of the responebétes of

apphcants under the Atonpea! Cutuww Hentege Act 2003 The Assesement Masager may wrsh to
include fs nformaton as an Advisory Note on the Decision Nodce ssued for the apphoanon

Under sechon 23 of he Abangna! Cultuew Hentege Act 2003 « person who careers out an actety must
take af reasonable and practcatte measures to ensure the actwrty does not harm Abongnal cultural
hertage (ihe “cutucal hentage duty of care”) Maou peraies for treactung the auty of care are
$750,000 for a corporahion and $75,000 for an inanadual

Appecants wil comply wth the duty of care in retsbon to Abongmal catural hentage ¢ they are acting in
accordance wth culteral duty of care gudebnes gazeTed under the Adangma! Cateral Hontage
Act 2003, mestabie on he DERM webete, or mn sccondance wih an agreement with the Atongmal party
for the area oF a cultural hentage management plan approved under part 7 of the Abongnaf Cuter
Mentage Act 2003

Appbcants are also encouraged io undertake a search of the (Cultural Hentage Database and
the Aboogna Cultural Mentage Regeter, admevstered by the Cultural Merfage Coortnation Unit,
GERM Appicanon forms to undertake a tree search of the Culteral Hentage Regater ad the
Ne NT eae ee ens anne Cucrunentene Cnt Ca G01) A MBG ex
en wabaete wiew DERM okt gov aulcetural tentece

Delegate Enquiries
Department of Emeronment and Resource Management
Canterary Square Buling,
Cume Street, Nambour © 4550

Leo PO Bas 573, Namboer QO 4560

AlSenior Officer (Planning and Asseasment) 1 +6175451 2222

Nambour Planning ~ South East Region Facsimile +61 7 S451 2260

Date 5 duty 2010 ‘Wobalte yewee cin cht sey sau

Attachments
‘The parts of the Nodce referred to above for each of the DERM roferral junscicbons wvotved wth he
applcabon

 

Page 2ot2+ Oei2t7 Cepartmert of Ervrcemect ard Resource Managerert:

Page 9 of 18

Page 10

    2010/627




Page 10 of 18


[OCR of page images]
2010/627

 

Department of Environment
and Resource Management

Sustainable Planning Act 2009

DERM Permit’ number: PR 315387; AN 433415; SPAR 00567510

 

 

 

 

 

 

Assessment manager roferonce : 2010627 Attn Tracy Jones

Date application receteed: 7 June 2000

Permit type: Oeeeiopment Approved

Relevant laws and policies: Envvonmental Protechon Act 1994 and ary related statutory
insurers and subordeate legetsbon, Operatonal Policy
Aasesang appbcatora for advice (wetacds, conservation estate
and hentage places)
Reconfigure a Lot - f any part of the tot is srtuated in a wetiand
Managemen arsa and the recorfiguraton results m more fan 6 lots,
oF any lot created 6 eas Man Sha
Sustamable Plannung Regulator 2009 - Schedule 7, table 2, dam 43
Reconfigure a Lot - df any part of fe kot & sQuated mn, of wetfen 100
Of, @ Commervaion estate and the recontigurston results in more than
10 bets, oF any bot created ot ees than She
Sustanabte Planning Megutshon 2709 - Schedule 7, table 2, dem 44

Development Description

Property Location Devetopment

205, 215A 217 8219 Lot 8,04 100m P9315 and =| Reconfiguaston of a Lot— 1 Lot nto 3 Loos

Dawe Low Way, Ket 76 MCH2969

Peregan Beach

 

 

 

Reasons) for no inciuaion of coaditions
le accordance math sectors 282 and 202 of (he Suvtaeable Pianeing Act 2006. te peasnnys) for no inckunen of

' PONE eh eles blehem. AE TNTEN. DETER. FOTN SSRI. CO MiLeIOS. HerbonD OF ea eveterd bene ap secured by katebor
@iematored by the Depetrent of Erveserent aed Resorce Mevagerset

 

Page | ot -Om1217

Oeparrert of Erercertert and Reecurce Maragenert @ Queensiand covernment

wow dewn.gid gov su AlN 6 640 20 406

Page 10 of 18

Page 11

    2010/627




                <


Page 11 of 18


[OCR of page images]
2010/627

 

DERM Permit ‘number: PR 315387; AN 433415; SPAR 00567510

 

eondnons stated m atu parnt poquired ty Me adwoe agancy response for The appeoaben are 2a fokows

The Assessment Manager mest conmsder the potental mpects of the propased development on the ecologeal
valves of the wetland, the wetland eater quabty aed, the wefand water regene Development should ensure he
folowing outcomes

+ There ts no loss of wetland habéat and adverse wmpacts from development are avowed If loss to the
wetland of acverse unpects are usavodable, leas and wnpects ae menrnmed and cfieets are
vestgated m order to achewe no net ines of the unpected wettend vals,

* «The water quabty of any waters in and inked fo the wettend & manntemed and managed to protect the
envronmertal values of the wetland and the water quabty obyectwes Ssted under Schedule 1 of the
Enwroomectal Protectoo (Water Poloy 2009 are acteevod

+ The essing water regene (including surface and groundwater) wih and beked to a wetaad
Managed to protect ecsting natural hydrologeal processes wilten the wetland ecoapsien Thee ncudes
tafeguerang natucet fucherbors wn sine and locaton of the wetland, and retaning and allowng for
rageneeston of yegetsbon

To ereure that the proposed development is able to meet the above outcomes. the Assessment Manager is
encouraged to consider the requirement for a Dufler area between any proposed works and he wetland A
wettand buffer has two components

* G@ SUPPORT ares adjacent to Ihe wetland that mantans and supports he envwoemental values of he
wettend,

* « B SeperHbON alee around the support aoe Pal protects he wetland fromm external threats such as
sediment and nuipent decharge from surrounding Snduse

‘The Assessment Manager shouks ensure that here is a suffoert buffer astance betesen any proposed works
and the referable wetland in order to mantizen the ecologeal functoning and integnty of the wefand Suter
@stances should be mauamesed on order to mamtan essing trodiversity values, habitat connectraty and to
eraremese edge effects

The apphcant is to provide a report prepared and certified by a biologst or equivalent that demonstrates to the
sabefacton of fe acsesament masager thal there are no adverse mmpacts on the ecological vadues and
functoning of he area of mgnticance

Revegetabon of the Suffer o recommended utteng locally nate spaces that reflect the pre-clsanng regoral
Soosystem, weth preference grenn fo endermes speces Plants should be of local provenance where possitle A
Rehatitabon’ Revegetabon Management Plan shoukl stpulaie a weed managemert strategy moluding weed
contre! and plant masntenance over a minemum one year penod Conditioning of any aperowal wath budding or
development envelopes) may also be a useful way to gwve formal effect to any required butler area

The Assessment Manager should conser requenng applicants to prowde a Stoerwater Management Plas to
demonatraie how stormwater, sediment and other run-clf from the 200 (exsoceted weth the constructon and
opersboral phases of dewelopment) well be etlecteety managed to prevent sdverse impacts on wetland valves
Potertal enpacts ace to be addressed through mater sensitive urban denign inching compliance wth Scout>
East Queensiand Regroral Pine 2009-2031 implementation Gudatne Wo 7 Water senwtve urban des ~
desegn otyectwves for whan stormwater management

Development should ensure hat

 

Page 2 of 2- Obt207 Cepaarteveel of Groverevmet bral Riemer Marr aperan et

Page 11 of 18

Page 12

    2010/627




Page 12 of 18


[OCR of page images]
2010/627

 

DERM Permit number: PR 315387; AN 433415; SPAR 00567510

 

* adverse impacts on fhe funchoning and integnty of habetat and envwonmental walues contaned witun
the conservaton estate are avoded, reremesed and mebgated, and

* «the current extent and conmectaty ecthin and Between conservation estate areas 6 mantaned

The Assecemen| Manager shoud eraure that there « a sulicent butler datance between any proposed works
and the conservaton estate bouncary im order to mauntteen the ecologe-l functoreng and wttegrty of the
conservation estaie Buffer astances should be maemeed in order to mamntan esting teodrversty values,
hatetat consectvity and to manenese edge effects The buffer may also asset m eneunng that stormwater and
waslewaler fom the development ste can be appropnately masaged to avod adverse unpects on the
conservation estate

Revegetaton of the butter is recommended wttrsing locally natve speoes that refect the pre-clearng regonal
ecosystem, with preference given to enderes species Plants should be of local provenance where possible A
Rehabétaton’ Revegetabon Management Plan should sapulate a weed management stategy including weed
comrol and plant mantenance over a Metrum one year pened

Newghbours to comservahon eviate need to lake seaponsdéty for keeping Gwelbngs and oer nirasbuctere near
Queenstans Parks aed Wiidide Sense (QPWS) managed lands in a Condibcr Pett meremenen Gre mek, ard to
Sppropnately ameboraie bght and nome mewes Consutsbon wth QPWS officers = recommended to ensure
management otyectves of the conservation estate including fre management, emesgency service access and
pest conbols are met A OP WS ‘Good Newhbour Policy’ may be of assistance and 1s available on the web at
tp were Germ Git ooy AUMennCeS leecurces Oar details one ier =201 165

A new frarnwork for the management of umpacts on koalas anaeng from planewng and dewelapment nn SEO wil
commence on 31 May 2010 Thee tenework inckiches

State Pinning Poicy 2/10 Kowts Conservator « South Ese Quemstiend
South East Queensiand Koes Consevystor State Panny Meguiwory Proves
Potcy for Net Gam for Koote Hatvtet we SEQ

Pokey for Stato Goverment Supported Communty intrastructure m SEQ
Bodversty Doveropment Otset Areas Statutory Gudeiwe

-—-—_—

Celegate

Simon Sorat

Delegate for the Chef Executve adrrenmstenng he Coasta’
Protector and Management Act 1995, Envvormentet
FProtecton Act 1994, Mature Canservenon Act 1992
Departmect of Enwronment ad Resource Maragement
1 duly 2070

 

Page Saf 3‘ Q91217 Cepartrert of Crvivsreect and Reszsrce Managerert

Page 12 of 18

Page 13

    2010/627




Page 13 of 18


[OCR of page images]
2010/627

 

Department of Environment
and Resource Management

Sustainable Planning Act 2009

Permit‘ number: ICO610NAM0011

 

Assasamant manager reference: ROL anioee?

Dute application recuived: 65 Jute 2010

Persut type: Concurrence Agency Fixaporee

Date of decision: 30 June 20

Decision. For a concurrence agency reaponme -

comdtons erust @tiach to aw devalapmert approval

Relevant laws and pelicies: Enrdronmentel Protection Act 1004
Sustainstve Planning Act 2009
Jurieciction(s): Ftecerfiguration of « let - Canteninahon of tend by enexpioded

ordnance (UXO) - Sustanatis Planning Regulation 2009 -
Schedule 7, table 2, hem 22(b)

 

Development Description(a)

[  PreapmertylLocation Development

216, HEA AY, Fi Gadd [Lee 8 Oe Ton | Mecordigiraion of a et — 1 ke to 3 ome
Low Way, Pergean Beach | Plan PICS ang
Let 70 on Plan
MCH2060

Reason(s) for inclusion of conditions

in accordance weth section 280 of the Susteemble Moning Act 2008 and section 270 of the Acts Iniepretadion
Act 1984, the seanon|) for Inclusion of condttons stated i thes perrett required by the concurrence agency
response for the apphosfon are as follows:

 

 

 

 

 

 

 

Reh 0K ACER, OC SA AERA RCA AN A IP ve He tee ny hacymeation
Aree ty Te CMR are 61 (rE ee! Clerc Mak mere

Page tof 4° OOnZtT
Uegnerl ened uf Renrceweey ont Newsurne Veregerert Q aweensiand Government
wore Gemnqid. genes ABN 48 440 7B1.<8

Page 13 of 18

Page 14

    2010/627




Page 14 of 18


[OCR of page images]
2010/627

 

DERM Permit number: 1CO610NAM0011

UXD 5 consktered 3 contermmnact under Secton 11 of the Loveonmecte Protection Act 1954 (FP Act).
The ade [Ihe subject los) & part of an area of land witen which the Deparment of Defence (Defence) tas
masemeed o utetonbel rok of sesedual UXO contarrenanen aaa Viet the Defence wodeeo

timp nema defence got Lona! for cota

Defence advises that Gevolopmert or land use rezoming proposals for land within a ‘subsante! zone should orty
proceed fofowang the conduct of UCD wvesagation and dearasce activites Defence mantans a bet of
cornrnerctel LOCO bewentigation and cerned seunch contractors fat @ accredits to cary oot thes work

Defence azo recommends that cemers or ccoupers of polenpally affected land and workers and contractors
employed on the land need to be aware of the procedure f a suspect abject i found.

DEAM «© informed on the extent of development that has bean carmed out on the efte 0 date. hs understood
thet there & no known rooord of UXD Deeg found on sre dunng of ance fat development

Jéeo, CERM has recently aeseened » UXO contractor's On investgtirve searciung of vericus parts of the
e¢e other than in the western porten of Lot 76 MCMZB00. faport, cated 25 May 2010 by Milsearch Pry Lad,
was ited "Post Actiity Rioport (Certfioabon), Uneapleded Ordnance Search, Poregan Caravan Park, 215
Owes! Low Way, Peragian Beach”.

‘Wide the exrdence to Gatn mebcates ho stn 6 uvicnty to be affected by LINO. he investigates work caning cut
with detection equipment by the UNO coniractor was necossarfy Envted and Dioretore Inconcluarre, Therefore,
bemed on Defence's mia! evaluation of UO-related risks in fhe site's locale, it bs consifered thal there may
Ferran 4 possiblity of UX0) Seing fund at leat on part of at.

Accordingly, an "Assessment of a Prolammary Report Concerning the Potential Contam nation of Land by
Uraepleded Ordnance (UNO) iaund by DERM on 11 June 2070 in regard to fies ste advised that condmons

must apply to any Giresiopment of the ate,

 

Page 2 of 4° OS42IT Oepertrert of Exvrowrert and Mescurce Meregerert

Page 14 of 18

Page 15

    2010/627




Page 15 of 18


[OCR of page images]
2010/627

 

DERM Permit number: ICO610NAMO00114 |

CONDITIONS

The folowing concurrence agency conditions are to be attached to my approval

' Prine to the commencement of ary develooment-ralated axcavation aarthwwerks or acd deturtancs of
the wesiom portion of Lot 76 MCH2060 that has rereained undketurbed by development works or cmeiar
acthity to date ard éeacribed © the “Assessment of » Pretirnirary Meport Concerning te Potential
Contariearton of Land by Limepleded Ordnance (UO) ssued by DERM on 11 June 2090 # regard to
‘ve sp (the subject lots), that part s to be subyectad to appropriate investigation acl where necessary.
remedial ackon.

2 Any person employed to work on fhe weetern portion of Lot 70 MCH2060 where Condition t has not
been satisfied or om any other part of the sie that DERM has not assessed st being clear of UXD, In to

be forewarned nm writs by Ihe applicant.

‘This warneng 15 80 explain that information available to DERM avhoates a alight potertzal for neschint '
UXO may otf coast on the site and work shook! eroceed wih dus caution, | o tp state the procedure to '
be followed by any parson finding an ctyect suspected of being UXD or component thereof: {

Do ret divas he object,

Take action, where appropriate, to prevert il being desterbed by anater parson,
Note its apprcodmate dimensions and gener! appearence.

Note the south to ate locxutions,

Advee he Police as soon as posatie

3 The sppbcent © to notify OFM of any LIK oF component of exploeree ordnance found on the site aa
soon as possible after such an object © ciscovered

4 Following he complete of af Gerveloprment-isted excarcation. emthworts or sol disturbance on the
bakerc of the mite, le. af parts other than the weeter pardon of Lot 76 MCH2060 described at 1 abown, »
wetten siatemont, signed by the pnnapal contractor. is to be provaied by the devuleper to DEF, That
statement Is fo advese the extent of 1) aft works conducted, 2) any LUNO-reisind evidence
detected cuting such works or beck thereof, bs to sebsequenty advise the Sunstone Coast
Regional Gounc#l and the aopiicant of Ms assesament in regard to the landuse sudabdity of thet Saiunce,

5 Following acton taken to salsly Condinen 1 above, the appieart & to subet «report, prepared im
acowdance wih curent to DERM for assnssmert, OORM bs tn subsequenty advse the
Serene Const Council and the opplicant of is assesament m regard to Comdtios 1 being

6 Pricr to Conditions 4 and S beng antinfied, no mocevntec grave, rock, mand oF sod Is lo be removed fom
the ate without written OFRM approval

7 The applicant 6 to advise the owner asd arty cccue of the site of the above resporebtes

General comments or advice about applications concerning land potentially alfected by UXO

Applicants may visit DERM's watedte tein ane derm.cic gov mu or Defencr's website
for the detzels of current UXO arenetigaton and remedal search contractors
socep reports based on invechgatve asd remedial work camed out by these contractors

lnveenhgetion and rettedial action in xaterty Goncitien | typcally evolves sampbng/esarct programs wath
detacton equipment untess the uso of such equpmest =

* comidered unwarranted by = LOCO contractor due to the extant of any prior excavabon or cartuworks
OF, Conversely, of amy fing proposed 2s part of the development program, or

Page 3 of 4° OpI2tT De perreest Of beecerer| eed Heeren es Mevezorrert

Page 15 of 18

Page 16

    2010/627




Page 16 of 18


[OCR of page images]
2010/627

 

DERM Permit number: |C0610NAMO0011

© prevented or made anpractoable by the presence of a structure, stockpile, natural Damer oF metal
waste.

Ih De latter case, alternative actos may be approprente to minimise the risk in the fest mstance For exmmipie,
where the nek of exposure to any LOCO that may cust reduced by the presence of a structure of natural
tamer, ssuance of De standard UXO warreng (see Condition 2) may suffice while the structure, stockpile or
terrae rerraaets om place, Vihere « siracture a to be remowed of reduced as ceri of the develapmant program,
protechve pracaufens, Commensents wath any greater risk to which workers meg! then be exposed, may need
1 De considered. Progressive assessment wil be necessary wher such clhounsiances ext Unioss, at the
conpieton of prolrenary works, Mere @ evidence then avadable t the LOO confractor Gat arry resedusal reat oe
maglgible, the exe of detection equipment wil tyoicaly be required to confirm the stn's stetue

Where wvestgation, along wath any subsequent remedial action and assessmert, 1s t be Inplonerntod By
1 Sabaly COM 1s ae 5 a pretirinery
along wth a management plan for tn propoasd work, Staged ewmrtgstonremedmston i most Mesty to
be appacable where development of smafier, burton lots (whch can presert GrouTsiances such as fhoeo
discussed above) or Oroadhectare ates is proposed. In such cases, DERM's asseaunent of the raport and advice
to Counel m regard approval of the Gevalopment wil be dependent on agreement wah the managernent plan.

Where Concdeton 1 1s to be satiefied by 2 whole lot or broadhectare development stage Deing rhjected to
ireeehgation and any necessary remedial action, DERM, based on the

fepert’s firings and recommendation/s, mary reassess the lot, oF that portion comprining he development stage,
am beng remadiited or nol nending rermadieion, and acvuse the appticant and Councd OPerwen, sy

DERM s Aree Manaooment Adeco wel contrive 00 actly. Thes unless evidence obtamed from the mwrstigated
pards can be used to relute Defence's assesarnert m regard to al! or part of the balaree in the lntier case, DERM

mary rremaees af of the Satance or the apphcatie party's an being uneflected by LUXO.

Enquiries:
Ranaié Scart, Peopect Manager (UXO) — Oepertnent of fieveonment and Resources Maragenent
Pr (07) 6468 6120 Fane (07) 5443 9827 omal.contamland.cxoddderm gid gov. aw

END OF CONDITIONS

*
’
oF
Le

 

Pope 4 of 4 opizer Depertrent of Ervtreerent aed Resource Marngerert

Page 16 of 18

Page 17

                                                                                                2010/627




                                                  Appeal Rights
                                                 SUSTAINABLE PLANNING ACT 2009 & SUSTAINABLE PLANNING
                                                 REGULATION 2009




The following is an extract from the Sustainable                       (ii)  the length of a period mentioned in
Planning Act 2009 (Chapter 6).                                               section 341 for the approval.
                                                            (3)     However, a submitter may not appeal if the
MATERIAL CHANGE OF USE, RECONFIGURING A                             submitter—
LOT & OPERATIONAL WORKS
                                                                    (a) withdraws the submission before the
Division 8 - Appeals to court relating to                              application is decided; or
development applications
                                                                    (b) has given the assessment manager a
461     Appeals by applicants                                          notice under section 339(1)(b)(ii).
(1)     An applicant for a development application          (4)     The appeal must be started within 20
        may appeal to the court against any of the                  business days (the submitter’s appeal
        following-                                                  period) after the decision notice or
        (a) the refusal, or the refusal in part, of a               negotiated decision notice is given to the
           development application;                                 submitter.
        (b) any condition of a development approval,        463   Additional and extended appeal rights for
           another matter stated in a development                 submitters for particular development
           approval and the identification or inclusion           applications
           of a code under section 242                      (1)     This section applies to a development
        (c) the  decision to give a preliminary                     application to which chapter 9, part 7
           approval when a development permit was                   applies.
           applied for;                                     (2)     A submitter of a properly made submission
        (d) the length of a period mentioned in                     for the application may appeal to the court
           section 341;;                                            about a referral agency’s response made by
        (e) a deemed refusal of the development                     a prescribed concurrence agency for the
           application.                                             application.
                                                            (3)     However, the submitter may only appeal
(2)     An appeal under subsection (1)(a), (b), (c) or
                                                                    against a referral agency’s response to the
        (d) must be started within 20 business days
                                                                    extent it relates to—
        (the applicant’s appeal period) after—
        (a) if a decision notice or negotiated decision             (a) if the prescribed concurrence agency is
            notice is given—the day the decision                       the chief executive (environment)—
            notice or negotiated decision notice is                    development for an aquacultural ERA; or
            given to the applicant; or                              (b) if the prescribed concurrence agency is
        (b) otherwise—the day a decision notice was                    the    chief   executive      (fisheries)—
            required to be given to the applicant.                     development that is—
(3)     An appeal under subsection (1)(e) may be                       (i)  a material change of use of
        started at any time after the last day a                            premises for aquaculture; or
        decision on the matter should have been                        (ii) operational work that is the removal,
        made.                                                               damage or destruction of a marine
                                                                            plant
462     Appeals by submitters - general
                                                            (4)     Despite section 462(1), the submitter may
(1)     A submitter for a development application
                                                                    appeal against the following matters for the
        may appeal to the court only against-
                                                                    application even if the matters relate to code
        (a) the part of the approval relating to the                assessment—
           assessment manager’s decision about                     9   a decision about a matter mentioned in
           any part of the application requiring                       section 462(2) if it is a decision of the
           impact assessment under section 314; or                     chief executive (fisheries);
        (b) the part of the approval relating to the               10 a referral agency’s response mentioned in
           assessment manager’s decision under                         subsection (2).
           section 327.
                                                            464   Appeals by advice agency submitters
(2)     To the extent an appeal may be made under
        subsection (1), the appeal may be against 1         (1)     Subsection (2) applies if an advice agency, in
        or more of the following—                                   its response for an application, told the
                                                                    assessment manager to treat the response
        (a) the giving of a development approval;                   as a properly made submission.
        (b) any provision of the approval including—        (2)     The advice agency may, within the limits of its
           (i)    a condition of, or lack of condition              jurisdiction, appeal to the court about—
                  for, the approval; or


                                                                                           Page 17 of 18

Page 18

                                                                                        2010/627

      (a) any part of the approval relating to the    467    Appeals about changing or cancelling
         assessment manager’s decision about                 conditions imposed by assessment
         any part of the application requiring               manager or concurrence agency
         impact assessment under section 314; or      (1)    A person to whom a notice under section
      (b) any part of the approval relating to the           378(9)(b) giving a decision to change or
          assessment manager’s decision under                cancel a condition of a development approval
          section 327                                        has been given may appeal to the court
(3)   The appeal must be started within 20                   against the decision in the notice.
      business days after the day the decision        (2)    The appeal must be started within 20
      notice or negotiated decision notice is given          business days after the day the notice of the
      to the advice agency as a submitter.                   decision is given to the person.
(4)   However, if the advice agency has given the     For Building Works Only
      assessment manager a notice under section       532    Appeals by applicants
      339(1)(b)(ii), the advice agency may not
      appeal the decision.                            (1)    If—
465   Appeals about decisions         relating   to          (a) a person has been given, or is entitled to
      extensions for approvals                                  be given—
(1)   For a development approval given for a                     (i)       an information notice under the
      development application, a person to whom a                          Building Act about a decision
      notice is given under section 389, other than                        other than a decision under
      a notice for a decision under section 386(2),                        that Act made by the
      may appeal to the court against the decision                         Queensland Building Services
      in the notice.                                                       Authority; or
(2)   The appeal must be started within 20                       (ii)      an information notice under the
      business days after the day the notice of the                        Plumbing and Drainage Act
      decision is given to the person.                                     2002 about a decision under
                                                                           part 4 or 5 of that Act; or
(3)   Also, a person who has made a request
      under section 383 may appeal to the court              (b) a person—
      against a deemed refusal of the request                    (i)       was an applicant for a building
(4)   An appeal under subsection (3) may be                                development approval; and r
      started at any time after the last day the                 (ii)      is dissatisfied with a decision
      decision on the matter should have been                              under the Building Act by a
      made.                                                                building certifier or referral
                                                                           agency about inspection of
466   Appeals about decisions         relating   to
                                                                           building work the subject of the
      permissible changes)
                                                                           approval; the person may
(1)   For a development approval given for a                               appeal against the decision to
      development application, the following                               a building and development
      persons may appeal to the court against a                            committee.
      decision on a request to make a permissible
                                                      (2)    An appeal under subsection (1) must be
      change to the approval—
                                                             started within 20 business days after the day
      (a) if the responsible entity for making the           the person is given notice of the decision.
         change is the assessment manager for
                                                      (3)    If—
         the application—
                                                             (a) under the Building Act, a person makes
         (i)   the person who made the request;
                                                                  an application other than a building
               or                                                 development application to a local
         (ii) an entity that gave a notice under                  government; and
               section 373 or a pre-request                  (b) the period required under that Act for the
               response notice about the request
                                                                  local government to decide the
      (b) if the responsible entity for making the                application (the decision period) has
          change is a concurrence agency for the                  passed; and
          application—the person who made the                (c) the local government has not decided
          request..                                               the application; the person may appeal
(2)   The appeal must be started within 20                        to a building and development
      business days after the day the person is                   committee against the lack of the
      given notice of the decision on the request                 decision and for the committee to decide
      under section 376.                                          the application as if it were the local
(3)   Also, a person who has made a request                       government.
      under section 369 may appeal to the court       (4)    An appeal under subsection (3) must be
      against a deemed refusal of the request.               started within 20 business days after the end
(4)   An appeal under subsection (3) may be                  of the decision period..
      started at any time after the last day the
      decision on the matter should have been
      made.

                                                                                   Page 18 of 18

Used in these records

About this file

File size
383 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SPA Decision Notice - 010.2010.00000627.001 [As Published].pdf · 383 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.