Council archive · source document
SPA Decision Notice - 010.2010.00000627.001 [As Published] · 152010.627
2010/627
Plan of Survey
2. In conjunction with the lodgement of the Plan of Survey for Council endorsement, legal
documentation must be presented to Council and must be submitted in the correct form with
the fees prescribed in Council's adopted fee schedule.
3. All outstanding rates and charges due and payable to Sunshine Coast Regional Council in
respect of the lots being reconfigured must be paid prior to endorsement of the Survey Plan.
4. Any changes required by Council’s Solicitor must be attended to prior to endorsing the Plan of
Survey. Any necessary Titles Office forms requiring the consent of Council is to be submitted
prior to the endorsing of the Plan of Survey.
Parkland Restoration and Dedication
5. Upon registration of the Plan of Survey, the relevant land required to be dedicated for park
purposes, as indicated on drawing M2358-03 Sheet 1 of 1 (and as may be amended by
findings from other conditions of this Permit), shall be dedicated to the Crown (with Council as
Trustee) for park and environmental protection purposes pursuant to the Land Act 1994 at no
cost to Council.
6. An Ecological Restoration Plan for the Parkland shall be prepared in accordance with the
requirements of Council’s Planning Scheme Policy PSP18 Ecological Assessment Guidelines
and submitted for Council approval prior to sealing the plans of survey. The park areas of the
site shall be revegetated and rehabilitated in accordance with the Council approved Ecological
Restoration Plan.
7. The Ecological Restoration Plan shall be prepared by a qualified and experienced Ecologist, to
the reasonable satisfaction of the Council. The Ecological Restoration Plan (ERP) shall be
applicable to the portion of the site to be dedicated to Council as Parkland and address
environmental weed removal and control, rehabilitation of existing vegetation communities and
revegetation strategies for degraded areas of the area of the site to be dedicated as parkland.
It shall identify all the areas of the park that require ecological restoration, specify actions and
works necessary to result in robust, self-sustaining, viable indigenous plant communities and
habitat. The ERP shall aim to revegetate the park areas with suitable native species to
resemble the local endemic ecosystem by removing all noxious and environmental weeds
from the site and include the planting and maintenance requirements of the Council approved
Bushfire Management Plan for the site. The ERP shall detail continual maintenance
requirements for a 1 year period (the maintenance period) to enable the revegetation and
rehabilitation works to be self-maintaining. To this extent Council’s Coordinator of
Environment and Landscaping must be consulted during the preparation of the plan.
8. The following, inter alia, shall be addressed and included in the Ecological Restoration Plan
and specifications:
8.1 document the current status of the areas requiring ecological restoration in terms of
structure, floristics, missing elements, health, vigour, etc.;
8.2 specify the required works and actions for each area in terms of:
8.3 site preparation (this may include thinning, grass removal, weed removal and control,
etc.);
8.4 establishment of the missing floristic and structural elements;
8.5 creating opportunities for regeneration from the seed bed, natural recruitment and the
establishment of wildlings;
8.6 habitat creation and reinforcement for native fauna and reinforcement of habitat
linkages and corridors;
8.7 planting and mulching procedures;
8.8 fertilizing procedures;
8.9 watering procedures;
Page 2 of 18
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SPA Decision Notice - 010.2010.00000627.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 383 KB (small file)
- File type
No other editions are linked here.