NOOSA COUNCIL IDAS Development Application Decision Notice                                                        5


       29.    Deleted.

       Refuse Collection

       30.    The proposed gates on the main access driveway shall be setback to enable sufficient room for a
              refuse vehicle to reverse from the proposed refuse collection area (at the frontage of the
              development at the end of the car-parking aisle) in order to be in a position where the refuse
              vehicle is able to leave the site in a forward direction.
       Carparking
       31.    Carparking shall be provided within the site as generally shown on proposal plan 382-DA 1-01C
              dated January 2006 by Dryhurst Halstead Architects, except as modified herein.

       32.    The 4 car park spaces at the frontage of the development shall be setback at least 2m from the
              front property boundary, with no vehicle overhang into this area.

       33.    All car parking spaces which are located adjacent to landscaped areas shall be provided with
              wheel stops to prevent vehicles from extending into the landscaped areas which overtime would
              destroy the vegetation planted in these areas.

       34.    Deleted.

       35.    Two speed humps shall be provided on the main access driveway as shown on the proposal plan.

       36.    The entire carparking area, including manoeuvring areas, shall be designed to comply with the
              provisions of AS2890.1 for user class 3 with allowance for vehicles to enter and leave the site in a
              forward gear.

       37.    All carparking shall be kept, maintained and line-marked in a condition fit for use.
       External Road Works
       Median
       38.    To prevent right turn vehicle movements to and from the development a solid centre median shall
              be constructed within Eumundi Noosa Road for at least the full length of the frontage of the
              development at no cost to Council. Any pavement line-marking works required as a result of the
              new median shall also be carried out at no cost to Council.
              In lieu of constructing the solid median across the site frontage, linemarking in accordance with the
              MUTCD may be provided with the initial construction and a monetary contribution of $6,500 shall
              be paid to Council to allow future construction of the median. The linemarking shall extend from the
              existing median to the north of the site to the existing chevron linemarking to the south of the site.
              The contribution shall be paid to Council prior to the commencement of the use. The contribution
              amount will be subject to variations in the Consumer Price Index, All Groups Brisbane from
              September 2006 until the date of payment.
              Detailed engineering plans of the median/linemarking and associated works shall be submitted to
              Council for approval prior to obtaining a Development Permit for Operational Works.
       Contributions Towards Future Roundabout
       39.    As only left-in and left-out access is proposed to the development, the applicant shall pay a
              monetary contribution of $20,000 towards the cost of a future roundabout at the intersection of
              Eumundi Noosa Road and Ely Street to enable vehicles to safely U-Turn in order to gain access to
              the development. This roundabout is estimated to cost in the order of $500,000 and the
              contribution of $20,000 will be subject to variations in the Consumer Price Index, All Groups
              Brisbane from September 2005 until the date of payment and shall be paid prior to obtaining a
              Development Permit for Operational Works.
       Vegetation Protection & Preservation
       40.    Where hard pavement areas are proposed within the drip zone of trees to be retained on site (or
              future landscaped areas), the pavement shall be designed as a pervious pavement to allow the
              flow of water to the trees root system (such as grass paving cells or similar). These pavements
              shall also be designed and constructed so as not to damage the trees root system in anyway and
              in this regard temporary fencing may be required around the trees during construction.
              Plans shall be submitted to the Council for approval that clearly show the type and extent of the
              pervious pavement and the temporary fencing prior to obtaining a Development Permit for
              Operational Works.




ab c:\docume~1\abecker\locals~1\temp\bcl technologies\easypdf 5\@bcl@5c0dc6aa\@[email protected]

Used in these records

About this file

File size
76 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SUPERSEDED - 05_1021 - COMPILED Decision Notice [As Published].pdf · 76 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.