NOOSA COUNCIL IDAS Development Application Decision Notice                                                         6


       Park Contribution

       41.    A Park contribution of $3,840 towards the acquisition of additional parkland or the improvement of
              existing parkland and facilities in the locality shall be paid to the Council prior to obtaining a
              Development Permit for Operational Works in accordance with Council’s Planning Scheme Policy
              PSP24 Park Requirements for Development Applications. This amount will be subject to variations
              in the Consumer Price Index, All Groups Brisbane from December 2005 until the date of payment.
       Frontage Works
       42.    Footpath improvements will be required to the frontage of the site wherever damage occurs as a
              result of developing the site. This may take the form of topsoiling, grassing, and tree planting as
              well as replacing any sections of the existing concrete pathway or kerb & channel if damaged.

       43.    All paths shall be designed and constructed to ensure pedestrian safety using non-slip materials
              and to produce an evenly graded surface finish.

       44.    Any redundant vehicular crossings to the site shall be removed and replaced by kerb & channel,
              footpath paving and landscaping such as trees and grasses in accordance with Council’s Standard
              specifications prior to commencement of the use permitted by this permit.
       Pathway Contribution
       45.    A pathway contribution of $864 towards external major pathways, in accordance with Planning
              Scheme Policy PSP41 Pathway Trunk Network Contributions, shall be paid to the Council prior to
              obtaining a Development Permit for Operational Works. This amount will be subject to variations in
              the Consumer Price Index, All Groups Brisbane from December 2005 until the date of payment.
       Stormwater Drainage
       46.    All stormwater drainage shall be collected on site and discharged so there is no net increase in
              stormwater runoff from the site. Stormwater drainage permitted to drain from the site shall be
              discharged to Council’s existing drainage structures. Plans of the drainage design shall be
              prepared by a Registered Professional Civil Engineer and submitted to Council prior to obtaining a
              Development Permit for Operational Works.

       47.    The method of collecting and discharging stormwater runoff as indicated on the Stormwater
              Concept Plan 05251/H2/A, dated July 2005, by Dryhurst Halstead Stuart Architects is generally
              considered acceptable. That is:
              47.1. To drain the front carparking area (4 car park spaces and manoeuvring area plus part of the
                    main driveway) into Eumundi Noosa Road via a Gross Pollutant Trap (GPT), and
              47.2. To provide 5 x 10,000 litre underground Precast Concrete Rainwater Tanks at the rear of
                    the site to store rainwater for use in the landscaped areas and in the nursery areas
                    distributed via a pressure pump and filter system, and
              47.3. To provide overflow capacity from the Tanks via 100 ag-drains into 4 x 12.5m long 600mm
                    x 600mm infiltration trenches lined with gravel.

       48.    To minimise the risk of this rainwater storage and infiltration system failing and causing flooding to
              downstream properties, overflow pipes shall also be installed from the trenches directly into the
              existing stormwater pit in the north-west corner of Lot 80 on SP138388 (within the property to the
              east and directly behind the proposed trenches). This will allow excess water to discharge from
              the site when the trenches are full, or the ground is fully saturated.

       49.    To ensure that polluted run-off does not enter Council’s stormwater drainage system, stormwater
              run-off from the carparking areas and the driveways shall have the first flush (the first 12 mm of
              rainfall or hose-down) collected in a grease/oil arrestor (or similar device) provided on site prior to
              being permitted to discharge from the site.
              Though a GPT is noted as being proposed towards the frontage of the development, a grease/oil
              arrestor or similar device will also be required at the rear of the site to collect run-off from the
              carparking and loading bay areas. All other clean stormwater, such as roof water, can bypass the
              GTP and grease/oil arrestors.
              A detailed maintenance plan shall be prepared for the proposed GPT and/or grease/oil arrestors,
              which shall be submitted to the Council for approval prior to obtaining a Development Permit for
              Operational Works.




ab c:\docume~1\abecker\locals~1\temp\bcl technologies\easypdf 5\@bcl@5c0dc6aa\@[email protected]

Used in these records

About this file

File size
76 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SUPERSEDED - 05_1021 - COMPILED Decision Notice [As Published].pdf · 76 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.