Skip to the record
Noosa's #1 Council Tracker.

Council archive · source document

SUPERSEDED - 05/1021 - COMPILED Decision Notice [As Published] · 132005.1021.02

of 15

Text shows just the words. Original shows the document exactly as it was published.

NOOSA COUNCIL IDAS Development Application Decision Notice                                                           8


              TOTAL                 $16,219
              All headworks contributions must be paid prior to the issue of a Development Permit for
              Operational Works.
              Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the
              headworks contributions not be paid at the due time, Council shall call upon the trading bank
              guarantee in full.
              In the event that the Development Permit for Material Change of Use of Premises lapses or is
              cancelled, the contribution or trading bank guarantee will be returned.
       Earthworks
       60.    Any filling works required on site shall be carried out in accordance with Section 3.8 of Council’s
              Engineering Design Standards Manual and so as not to cause the additional ponding of water on
              any adjoining lands or the blockage of, or interference with, any natural watercourses. Detailed site
              surveys indicating natural surface levels and contours of the adjoining properties must be provided
              with the application for a Development Permit for Operational Works for Filling and Drainage.
              This may require the design and construction of drainage pipes and/or an overland flow-path within
              the development site that caters for drainage from the adjoining sites for a design storm with an
              Average Recurrence Interval of 1 in 100 years. A private easement for the Drainage of Water
              encompassing the drainage pipes or overland flow-path will also be required. In this regard a
              Development Permit for Operational Works shall be obtained.
              Should evidence be provided to Council indicating that no additional ponding of stormwater will
              occur on the adjoining properties the requirement for the drainage pipes, overland flow-path and
              easement shall not apply.
       61.    Earthworks carried out on site shall not affect the structural integrity of any of the existing fences or
              structures that border the development site. Fences that are affected shall be replaced prior to the
              Building Certifier issuing the Certificate of Classification. In this regard any fences to be replaced
              shall be clearly shown on the plans submitted for Operational Works approval.
       Erosion and Sediment Control
       62.    Any person acting on this permit shall prevent erosion and sediment export from leaving the site.
              Site control measures such as silt fencing, controlled gravel access to the site and controlled
              disposal of waste, will be necessary.
            In this regard plans detailing the methods of controlling erosion and sediment are required to be
            submitted to the Council for approval prior to obtaining a Development Permit for Operational
            Works.
       General
       63.    A suitably qualified Registered Professional Engineer shall prepare engineering drawings and
              specifications for all engineering works that will become Council infrastructure, which shall be
              submitted in conjunction with an application for a Development Permit for Operational Works. In
              this regard a DXF/DWG file on GDA94 zone 56 grid of the proposed cadastre layout is to be
              submitted in conjunction with any application for Operational Works.

       64.    Digital detailed design drawings and calculations shall be submitted with any application for a
              Development Permit for Operational Works in respect of roadworks and stormwater drainage
              works. To avoid conflict with underground pipes or services, all existing and proposed services
              required by the development shall be shown on the plans.

       65.    To facilitate production of As Constructed drawings it is suggested that all design drawings are
              submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of
              ADAC are available at www.adac.com.au).

       66.    Any damage caused to any public utility during the course of construction shall be repaired to
              Council’s standards and at no cost to Council.

       67.    Any alteration of any public utility or other facilities necessitated by the development of the land or
              associated construction works external to the site shall be at no cost to Council.

       68.    The transportation of all materials to and from the site shall be undertaken in a manner such that
              no particle matter escapes onto a public road. All vehicles carrying materials either to or from the
              site shall be covered to prevent materials including dust being windblown from the vehicle.




ab c:\docume~1\abecker\locals~1\temp\bcl technologies\easypdf 5\@bcl@5c0dc6aa\@[email protected]

Used in these records

About this file

File size
76 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SUPERSEDED - 05_1021 - COMPILED Decision Notice [As Published].pdf · 76 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.