Performance outcomes Acceptable outcomes Response
Editor’s Note—Water supply capacity for fire
fighting purposes is in addition to water supply
capacity for other uses and activities on the
premises.
Essential Community Infrastructure
PO4 AO4.1 R4.1
Essential community infrastructure is able to Development involving essential community
The proposed re-development of the Doonan
function effectively during and immediately infrastructure is not located within a medium or
Waste Management Centre does not involve
after bushfire events. high bushfire hazard area.
essential community infrastructure
OR
AO4.2
Where located in a medium or high bushfire
hazard area, development involving essential
community infrastructure is designed to function
effectively during and after a bushfire event in
accordance with a Bushfire Hazard Management
Plan.
Editor’s Note— PSP8 Natural Hazards provides
guidance for assessing bushfire hazard risk and
preparing a bushfire hazard management plan.
Hazardous Materials
PO5 R5
Public safety and the environment are not AO5
Hazardous materials are not manufactured or While the waste management centre may f
adversely affected by the impacts of bushfire
stored in bulk in a bushfire hazard area. rom time to time have or temporarily store
on hazardous materials manufacturing or
hazardous material in bulk this material is not
RFA24-059 – Noosa Land Fill and Waste Management Facility – Bushfire Management Plan
Rob Friend & Associates Pty Ltd 10th of October 2024
Document Set ID: 23617065
Version: 1, Version Date: 05/03/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.