INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA 15 SEPTEMBER 2015
Budget Commentary
The budget for the 2014-15 financial year indicates that revenue was slightly above estimates
and expenditure was below estimates. Waste Management had a Net Operating Result of
$5,145,233, which was $628,176 better than predicted. The operating surplus was $3,835,922,
which was $803,856 above predictions. The Waste Management budget was in a sound position
for the duration of the 2014-15 financial year.
The figures for the first month of the 2015-16 financial year show that the budget is currently on
track with predictions.
Capital Works Projects
Road repairs at Eumundi Road Resource Recovery Centre
Waste Management will commence significant repairs to the entry roads around the weighbridge
at the Eumundi Road Resource Recovery Centre during September 2015. The first stage of the
works will be conducted over 28 days during a break in the bulk kerbside collection service.
The works will require modified traffic conditions at the facility for the period and some disruption
and delays are expected for those using the facility. The works have been advertised on site and
are to be advertised in social media to ensure that the public are aware of the potential
disruption. Stage Two will be carried out in the 2016-17 financial year.
Commissioning of Cell 2.2
Waste Management has recently conducted repairs on the leachate collection system that was
constructed several years ago in Cell 2.2. The repairs were to ensure that the first quadrant of
the cell could be hydraulically isolated from the other three large quadrants for stormwater control
initially and later for leachate management. This will allow Council to commence using just the
first quadrant of the cell for waste disposal and therefore minimising the capture of stormwater
and generation of leachate that will require collection and disposal. It is predicted that Cell 2.2
will start receiving selected waste in February 2016.
High Efficiency Sedimentation (HES) Basin upgrade and Bio Basin
The High Efficiency Sedimentation (HES) Basin upgrade and Bio Basin construction at Eumundi
Road landfill has almost reached completion. The remaining works are to install an automated
monitoring system (SCADA) that will allow Council to remotely monitor the quality of water
leaving the site in real time, ensuring an immediate response should any issues be identified.
This work has been delayed due to negotiations with EHP regarding their water monitoring
requirements.
2. CUSTOMERS
Solid Waste Collection Services
Bin Service 1 July 2014 1 July 2015
240 Refuse 29,263 29,634
140 Refuse 67 68
240 Recycling 24,371 24,947
240 Garden 3,129 3,714
1m3 Bulk 33 28
1100 Refuse 372 367
1100 Recycling 264 290
1.5m3 Bulk 210 203
2m3 Bulk 12 13
3m3 Bulk 213 214
27m3 Compactor 1 1
Page 55 of 73
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.