INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA 15 SEPTEMBER 2015
2. Alternative Solution
A shared zone was originally considered as an option and having investigated the sheet pile
proposal in more detail it is now considered that the raised concrete shared zone solution will
address the problem in a much shorter timeframe, and at greatly reduced cost and disruption as
shown in Attachment 2. This will in effect, formalise where pedestrians are currently walking
given the closure of the current unsafe footpath.
Council may consider further protective treatment of the foreshore at a time when an agreement
is reached with interested parties in the adjacent jetty, noting it is not anticipated that any works
would be required for a number of years.
Previous Council Consideration
Nil.
Finance & Risk
Risks associated with construction of a raised shared zone will be greatly less than the risks
involved in constructing the sheet pile wall and elevated deck.
Risks from conflicts with the adjacent waterway structures are also negated by moving the
construction zone back from the shore.
Reduced times for road closure will result in less conflict with local residents and other traffic.
Finance
Cost to date (geotechnical investigation, road design, legal) $100,648
Preliminary estimate for design and construction of raised shared zone $200,000
Total Cost $300,648
Budget allocation $140,878
Additional funds required $159,770
Consultation
External Consultation - Community & Stakeholder
GHD Consulting Engineers
Internal Consultation
Director, Corporate Services.
Departments/Sections Consulted:
Community Services X Planning & Infrastructure
Disaster Management & Public Order Building & Plumbing Services
Waste & Environmental Health DA Planning
Community Facilities Strategic Land Use Planning
Cultural Facilities X Asset Design & Investigations
X Asset Planning
Civil Operations
Environment
X Executive Office X Corporate Services
Community Engagement X Finance
Customer Service ICT
Executive Support Procurement & Fleet
Governance Property & Facilities
Human Resources Revenue Services
Page 9 of 73
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.