NOOSA COUNCIL IDAS Development Application Decision Notice 3 of 7
Noosa Council Conditions
INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION
1. The development shall be carried out in accordance with Engineering drawings Nos.
H02 B dated 15 November 2007 by Sweet Design Innovations
BM070201-C01 dated October 2007 by Barlow Gregg VDM
07-3646-5 dated 14 November 2007 by Burleigh Design
or as modified herein.
2. Roof and surface runoff connection to Council’s drainage system shall be as shown on drawing No. H02
B.
5. A footpath 1.5 metres wide shall be constructed across the full frontage of the development. The footpath
shall have a slip resistant surface. The alignment, of which, shall be determined on site with Council’s
Construction Technical Officer. The expansion joints in any footpath shall be “sawcut” not trowel jointed.
6. Install suitable root barrier where proposed trees are adjacent to paths, pavement etc in accordance with
Council’s Planning Scheme Policy PSP03 Landscaping Plants and Guidelines.
7. Council’s Construction Technical Officer – Mick Conroy (ph 0410 512 505), shall be given seven (7) days’
notice of intention to commence works to arrange a “pre start” meeting regarding the civil works.
8. The principal contractor must have all the appropriate insurance and public liability documentation to carry
out the works. The principal contractor is also responsible to ensure that any sub contractors also have
the appropriate insurance and public liability documentation.
9. Prior to the “pre start” meeting, the principal contractor must be provided with a copy of Council’s
signed approved drawings and conditions by the applicant.
10. Prior to works commencing, Council is to be advised of the Engineer (RPEQ) supervising the project.
(This person will be the contact for the project).
11. Council standards shall apply to these works unless otherwise modified herein.
12. The person acting on this permit shall ensure that its consultants and contractors take all reasonable care
during the construction of the engineering works to ensure that Council property, road pavements or
facilities (such as underground drainage, water supply, sewerage, footpaths, kerbing, landscaping, street
furniture etc.) are protected against any damage or interference whatsoever.
If any Council property or facilities should be damaged by the Applicant or any of its Consultants or
Contractors through any cause whatsoever in the course of, directly or indirectly, carrying out the
engineering works, the Applicant and/or its Contractors shall forthwith notify the Manager Land
Development and shall forthwith rectify the damage to that property or facility at its cost and to the
satisfaction of the Manager Land Development.
All rectification works are to be completed prior to the commencement of the use or, alternatively, the
Applicant may request the Council to carry out the rectification work at the Applicant’s cost, such cost
being paid by the Applicant to the Council prior to the commencement of the use.
In the case of any emergency the Council shall be entitled to rectify such damage at the cost of the
Applicant, such cost being paid prior to the commencement of the use.
13. The development of the site shall be carried out in such a manner as to prevent dust and/or sand
nuisance to residents and/or tenants in the vicinity of the development.
NSC c:\docume~1\rhr\locals~1\temp\bcl technologies\easypdf 5\@bcl@8404d7ba\@[email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2007.00002024.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 30 KB (small file)
- File type
No other editions are linked here.