Decision Notice - 010.2007.00002024.001 [As Published] · 142007.2024
NOOSA COUNCIL IDAS Development Application Decision Notice 4 of 7
14. Construction work and other associated activities are permitted only during the hours of 7.00 am and 6.00
pm Monday to Saturday. No work is permitted on Sundays or public holidays, except where extended
hours are approved by the Manager-Land Development or his nominee.
15. All signage, including that for safety during construction shall be in accordance with the Manual of Uniform
Traffic Control Devices and Traffic Infrastructure (Roads) Act.
16. Safe pedestrian access on Grant Street shall be maintained at all times. Should footpath / road closures
be necessary to carry out construction works, Council’s Construction Technical Officer (ph 0410 512 505)
must be notified prior to the proposed closure.
17. Sediment and erosion control measures must be in place prior to works commencing. If such measures
are not in place or are not satisfactory, “on the spot “fines may be issued. Such fines can be issued if
sediments from the site are found to enter or have the potential to enter Council’s stormwater system or
natural waterways. Although the sediment and erosion control measures have been approved on drawing
No BM070201-C01, Council’s Manager – Land Development may request further controls to be installed
should approved measures be inefficient.
18. Prior to acceptance of civil works to become Council assets "On Maintenance", the lodgement of
satisfactory “As Constructed” records shall be submitted to Council.
As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer (RPEQ) for
design intent, and a Licensed Surveyor shall certify the cadastre and the location, level and type of all
services and structures. All of which shall be submitted to Council for checking and for Council’s records.
The data must fully detail levels for all engineering works including but not limited to drainage structures,
finished ground levels and pavement surface levels. The data shall be submitted in the Asset Design and
As Constructed (ADAC) digital format. (Guidelines on the use of ADAC are available at
www.adac.com.au) and Council’s Planning Scheme Policy 5 – Engineering Design Standards – Roads,
Drainage and Earthworks.
Approval of works shall not be granted until all As Constructed information has been supplied and
accepted by Council.
19. A 5% cost of works to become Council assets or $1,500 bond (whichever is the greater) will be imposed
on construction works during the maintenance period, which is a minimum period of 12 months duration.
Such bond must be lodged by, and shall only be accepted from the Developer for the works.
20. The works to become Council assets will not be accepted "On Maintenance" until the landscaping is
completed.
21. These works are also to be in compliance with the relevant conditions of Development Permit No.
2007/0799.
22. Pursuant to Section 3.5.21(5) of the Integrated Planning Act 1997, the Relevant Period is two (2) years
from the day this permit takes effect (26 November 2009) during which time all conditions must have
been complied with and the Plan of Survey lodged with the Council for endorsement.
23. Notwithstanding that Council has checked the plans with due care, where it is found during construction
that variations from Council's standards exist, then Council standards shall apply.
NSC c:\docume~1\rhr\locals~1\temp\bcl technologies\easypdf 5\@bcl@8404d7ba\@[email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2007.00002024.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 30 KB (small file)
- File type
No other editions are linked here.