4.0 TRAFFIC OPERATIONS
4.1 Assessment Scenarios
It is standard practice when analysing future year traffic operations to adopt a ten year design horizon
from the year of full occupation. Therefore, the following development staging has been adopted:
Traffic Counts: 2013
Development Application: 2013
Construction and Full Occupation: 2015
Occupation plus 10 years: 2025
4.2 Background Traffic Growth
The scenarios modelled reflect the development staging with detailed analysis undertaken on the existing
conditions, opening year (2015)and the future year (2025). A background traffic growth rate of 1.8% per
annum has been adopted, as sourced from the Department of Local Government and Planning (DLGP)
Population Forecasts. Given the site’s proximity of the site to border with Maroochy, we have taken an
average of the growth rates of resident population in Noosa (0.9%)and Maroochy (2.6%).The application
of this rate equates to an approximate 22% increase in local traffic volumes over the next 12 years (2013-
2025).
4.3 Traffic Generation
The peak hour traffic generation for the proposed development has been estimated by applying published
traffic generation rates from the RTA Traffic Generating Developments as follows:
_ Thursday Evening Peak: V(P) 20A(S) + 51A(F) + 155A(SM)+ 46A(SS) + 22A(OM)
=
Saturday Peak: V(P) =
38A(S) + 13A(F)+ 147A(SM) + 107A(SS)
The abbreviations are as follows:
V(P): vehicle trips per 1,000m2 GFA
A(S): total Slow Trade GFA (m2)
A(F): total Fast Trade GFA (m2)
A(SM): total Supermarket GFA (m2)
A(SS): total Specialty Shops GFA (m2)
A(OM): total Office / Medical GFA (m2)
It is estimated that the proposal will generate in the order of 205 vte during a typical Thursday evening
peak hour and 242vte during a Saturday peak hour. It is assumed that both the Thursday evening and
Saturday morning peak hour in:out split is typically 50:50. The entry/exit movements expected to result
P,120ii.i21J2-060PEREGIANBEACH SCIREPORTSli2-060PEREGIAN TiA REVISIONA.DOCX 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application part 6 of 10 Traffic Impact Assessment - MCU13/0092Related documentApplication case desk ↗
About this file
- File size
- 33.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.