Skip to the record
Noosa’s premier civic archive.

Council archive · source document

Development Application part 6 of 10 Traffic Impact Assessment - MCU13/0092

of 63

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (33.9 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

1-11
..KOl TRAffiC & TRANSPORT




         Figure 4.1:              DEVELOPMENT DIRECTIONAL DISTRIBUTION


                                      45%
                                            ~
            I David low Way (North)                                                                                           J
                                                                                                          David low Way (South)


                                                       L__
                                 l r r-                --

                                                             50%

                                  50%       45%




                                                   ~   95%
                                                                               SITE




                                                                                  100%


                                                       L               100%__t    J            RufousStreet   I
                                             r t_95%
                                               r-            5%



              ~                             5%




4.5      Intersection Performance


         The likely impact of the proposed development on the future year (2015 and 2025) peak hour operations

         on   the surrounding road network has been assessed based on the peak hour scenario turning movement

         forecasts. A series of SIDRA analyses were conducted for the following intersections.


                   David Low Way / Woodland Drive intersection

                   \l\Toodland Drive / Rufous Street intersection


         These     were     based       on       the   turning movement forecasts presented in Appendix E for the following
         scenarios:



                   Existing year (2013)
                   Opening year (2015)pre-development
                   Opening year (2015)post-development
                   Future year (2025)pre-development

                   Future year (2025)post-development


         The results of these analyses are presented in Appendix B and discussed in more detail below.




P:120JJ-J2IJ2.MOPEREGJANBEACHSC1REPORTSIJ2-MOPEREGJANTIAREVISJONA.DOCX                                                            16

Used in these records

About this file

File size
33.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application part 6 of 10 Traffic Impact Assessment - MCU13_0092.pdf · 33.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.