Council archive · source document
Development Application part 6 of 10 Traffic Impact Assessment - MCU13/0092
Very large file (33.9 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
MOVEMENT SUMMARY
Site: 2015 PM Post Development
12-060 Peregian Beach SC
David Low Way / Woodland Drive
2015 PM Pre Development
Giveway / Yield (Two-Way)
Level of Service (LOS)Method: Delay (HCM 2000).
Vehicle movement LOS values are based on average delay per movement
Minor Road Approach LOS values are based on average delay for all vehicle movements.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a
good LOS measure due to zero delays associated with major road movements.
SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.
Gap-Acceptance Capacity: SIDRA Standard (Ak elik M3D).
HV (%)values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Processed: Tuesday, 14 May 2013 4:50:33 PM Copyright@ 2000-2013 Akcelik and Associates Ply Ltd
SIDRA INTERSECTION 6.0.2.3730 www.sidrasolutions.com
SIDRA
Project: P:\2011-12112-060 Peregian Beach SCICalcslSIDRAIRevised SIDRAIDavid Low Way -
Woodland Dr.sip6 INTERSECTION 6
8000122,ADAM PEKOL CONSULTING, PLUS /1 PC
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application part 6 of 10 Traffic Impact Assessment - MCU13/0092Related documentApplication case desk ↗
About this file
- File size
- 33.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.