MOVEMENT SUMMARY
Site: 2025 PM Pre Development
12-060 Peregian Beach SC
David Low Way I Woodland Drive
2025 PM Pre Development
Giveway I Yield (Two-Way)
-- - -
Movement Performance -
Vehicles
~Mov
~;:’~P~gj:;,’I~yerag~.~L.1;Level oq;~I’:95%’
Dema,n<;l ,FLows~’; Oue~~~"_,~;:). ~roP:!l~f~Ettt?.ctl’l~:’~~~[’.
Ba,~~ f j’ er
’\~~~l.O.(~
;1IP,~~~~~.M Z~iflJIot.’!!~’;’;1.t’i’HV ::~t~t~tsa.t~~lJ[).~laYi; N~.r,i.cJ~~,;..,~19!1\~?e: fQ~e<u~?:!l;’;,s~o~
’l),l,S,:rvice ’.i~.
; ~peedg~~’
,~ate:’t,1 ,
i!ki’;:,., .jM{,~... ,~ veh/h’.~,~~~o/o0l’l.)th~.4’V/C,^",0t0K1sec ,"J ’
~; "~~ ,}~" :,-’;",weh m ’.J;,r",-<l.t, J’..;’.;;;, Hll er veh ;,i;t~"ikm/h
South: David Low Way_ -
South
1 L2 33 1.0 0,326 0.6 LOS A 0.0 0.0 0.00 0.07 59.2
2 T1 596 1.0 0.326 0.6 LOSA 0.0 0.0 0.00 0.07 59.2
3u U 20 1.0 0.019 13.4 LOS B 0.1 0.5 0.50 0.73 44.8
Approach 649 1.0 0.326 0.9 NA 0.1 0.5 0.02 0.09 58.6
North: David Low W y~ North
-
8 T1 511 1.0 0.264 0.0 LOSA 0.0 0.0 0.00 0.00 59.9
9 R2 16 1.0 0.020 12.7 LOS B 0.1 0.6 0.55 0.75 45.2
9u U 2 1.0 0.020 12.7 LOS B 0.1 0.6 0.55 0.75 45.2
Approach 529 1.0 0.264 0.5 NA 0.1 0.6 0.02 0.03 59.3
West: Woodland Drive -
West
10 L2 5 1.0 0.128 21.8 LOSC 0.4 2.9 0.79 0.93 38.4
12 R2 30 1.0 0.128 21,8 LOSC 0.4 2.9 0.79 0.93 38.4
Approach 35 1.0 0.128 21.8 LOSC 0.4 2.9 0.79 0.93 38.4
All Vehicles 1214 1.0 0.326 1.3 NA 0.4 2.9 0.04 0.09 58.0
Level of Service (LOS)Method: Delay (HCM 2000).
Vehicle movement LOS values are based on average delay per movement
Minor Road Approach LOS values are based on average delay for all vehicle movements.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a
good LOS measure due to zero delays associated with major road movements.
SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.
Gap-Acceptance Capacity: SIDRA Standard (Ak elik M3D).
HV (%)values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Processed: Tuesday, 14 May 2013 4:50:33 PM
SIDRA INTERSECTION 6.0.2.3730
Copyright@ 2000-2013 Akcelik and Associates Ply Ltd
www.sidrasolutions.com
SlfAA
Project: P:12011-12112-060 Peregian Beach SCICalcslSIDRAIRevised SIDRAIDavid Low Way
8000122,ADAM PEKOL CONSULTING, PLUS /1PC
-
Woodland Dr.sip6
INfERs-et’TfN &
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application part 6 of 10 Traffic Impact Assessment - MCU13/0092Related documentApplication case desk ↗
About this file
- File size
- 33.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.