Skip to the record
The only place to find full transcripts.

Council archive · source document

Development Application part 6 of 10 Traffic Impact Assessment - MCU13/0092

of 63

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (33.9 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

MOVEMENT SUMMARY
Site: 2025 SAT Pre Dev

12-060 Perigian Beach
Woodland Drive I Rufous Street
2025 SAT Pre Development
Giveway I Yield (Two-Way)




                                   1.0       0.048          10.9      LOS B               0.2             1.3   0.27    0.68   46.9

            R2                                                        LOS B               0.2             1.3   0.27    0.68   46.9

 Approach                    37    1.0       0.048          10.9      LOS B                0.2            1.3   0.27    0.68   46.9

 East: Wo       and D   -   East

 4          L2               35    1.0       0.038           4.5       LOSA               0.0             0.0   0.00    0.44   53.8

 5          T1               38    1.0       0.038           4.5       LOSA               0.0             0.0   0.00    0.44   53.8

 Approach                    73    1.0       0.038           4.5          NA              0.0             0.0   0.00    0.44   53.8

 West: Woodland Drive   -   West

 11         T1               65    1.0       0.035           0.6       LOSA               0.2             1.4   0.17    0.04   56.0

 12         R2                2                                                           0.2                   0.17    0.04   56.0

 Approach                    67    1.0       0.035           0.6          NA              0.2             1.4   0.17    0.04   56.0


 All Vehicles               177    1.0       0.048           4.4          NA              0.2             1.4   0.12    0.34   53.0



Level of Service (LOS)Method: Delay (HCM 2000).
Vehicle movement LOS values are based on average delay per movement
Minor Road Approach LOS values are based on average delay for all vehicle movements.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a
good LOS measure due to zero delays associated with major road movements.
SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.

Gap-Acceptance Capacity: SIDRA Standard (Ak lik M3D).
HV (%)values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.




Processed: Tuesday, 14 May 2013 2:28:46 PM           Copyright @ 2000-2013 Akcelik and Associates Pty Ltd
SIDRA INTERSECTION 6.0.2.3730                        www.sidrasolutions.com                                     SIDRA
Project: P:12011-12\12-060 Peregian Beach SC\Calcs\SIDRA\Revised SIDRA\Woodland Dr   -
                                                                                         Rufous St.sip6         INTERSEtTION 6
8000122,ADAM PEKOL CONSULTING, PLUS 11PC

Used in these records

About this file

File size
33.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application part 6 of 10 Traffic Impact Assessment - MCU13_0092.pdf · 33.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.