Development Assessment Report
DRIVEWAYS AND CAR PARKING CODE
The overall outcomes sought for the Driveways and Carparking Code are the following:
a) To ensure safe and reasonable access from the public road edge to and from vehicle
accommodation and standing areas within the property.;
b) The safety of pedestrians and cyclists is protected;
c) Carparking spaces and the associated manoeuvring areas provided are designed to be safe
and functional and meet the reasonable requirements of the particular land use;
d) Adequate provision is made for the standing, parking, loading and unloading, access and
manoeuvring of service vehicles within the development site;
e) Development does not adversely impact on existing public parking; and
f) Vehicular access does not impact adversely upon existing landscaping or native vegetation.
Comment: Please refer to the Traffic Report prepared by Hayes Traffic Engineering and proposal
plans. These documents demonstrate that the access arrangements proposed are safe and efficient;
that the development will not lead to any adverse safety or road condition impacts in the locality; all
cars will be able to enter and leave the site in a forward motion; adequate provision is made for
service vehicles and that the carpark is designed in accordance with AS2890.1. The proposal achieves
compliance with the Outcomes of the Driveways and Carparking Code.
EARTHWORKS CODE
The overall outcomes sought for the Earthworks Code are the following:
a) ensure that earthworks do not unreasonably impact on the natural environment or other
properties with regard to—
i. land stability (including differential settlement or expansion in reactive soils);
ii. contamination of land;
iii. flooding and drainage;
iv. groundwater, watercourses and wetlands;
v. loss of native remnant or regrowth vegetation; and
b) Earthworks are designed and constructed to be structurally sound.
Comment: Earthworks will not have any detrimental impact on the natural environment or other
properties. All earthworks will be designed and constructed to be structurally sound and will be
undertaken in accordance with design approved as part of a subsequent operational works
application.
EROSION AND SEDIMENT CONTROL CODE
The overall outcomes sought for the Erosion and Sediment Control Code are the following:
a) construction activities are managed to prevent erosion and sedimentation to offsite waters
including stormwater, creeks and rivers;
b) development facilitates erosion control, drainage control and sediment capture and
treatment; and
c) construction activities within watercourses are planned to prevent erosion, construction failure
and associated sedimentation.
Comment: Appropriate erosion and sediment control will be implemented for the development in
accordance with a subsequent operational works application.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Development Assessment Report.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.