Figure 2.2: Developed Scenario Catchment Plan
A comparison of the Existing and Developed scenario peak flow shows the Site would result in an increase in peak flows if the detention basin
was not constructed, which is in line with outcomes of the approved SMP (AquaIntel, 2016).
TABLE 3.4: PEAK DISCHARGE COMPARISON – EXISTING VS DEVELOPED SCEANRIO
63% AEP 50% AEP 20% AEP 10% AEP 5% AEP 2% AEP 1% AEP
Existing (m3/s) 0.60 0.72 1.11 1.41 1.68 1.99 2.23
Developed (m3/s) 0.83 0.98 1.47 1.79 2.10 2.45 2.74
Difference (m3/s) 0.22 0.26 0.36 0.38 0.42 0.46 0.51