     3.1.3       Mitigation Scenario
For the Mitigation Scenario, the only update made to the Developed Scenario model was to represent the approved / constructed detention
basin. A summary of the elevation-storage data for the detention basin is provided in Table 3.5 with a summary of the outlet configuration
and key details provided below:

•     Outlet Summary:

      –    Pipe 1 = 1 x 225mm at RL1.56m.

      –    Pipe 2 = 900 x 900mm culvert at RL1.56m.

      –    Weir = 5m at RL2.72m.

TABLE 3.5: ELEVATION-STORAGE DATA FOR APPROVED / CONSTRUCTED DETENTION BASIN

    Elevation (m RL)                                                   Volume (m3)


    1.56                                                               0

    1.7                                                                81

    1.9                                                                206

    2.1                                                                344

    2.3                                                                494

    2.5                                                                659

    2.7                                                                841

    2.8                                                                1019


A comparison of the existing and mitigated peak flows at the Site outlet is presented in Table 3.6. The results show that a minor increase in
peak flows is expected in the smaller events (<10% AEP) and the 1% AEP, with reductions in the 5% and 2% AEP events. As the catchment
details have not changed significantly between the approved SMP and this update, it is considered the minor increases are a result of the
change in the hydrologic method from ARR1987 to ARR2019 and the change to the losses. As such, it is considered that these minor increases
would not result in actionable nuisance, and the outcome remains consistent with the approved SMP. Further to this, the Site’s bioretention
system will provide some additional detention in the smaller flood events to help in managing this further.

TABLE 3.6: PEAK DISCHARGE COMPARISON – EXISTING VS MITIGATED SCENARIOS


    Scenario              63.2% AEP         50% AEP       20% AEP           10% AEP        5% AEP             2% AEP         1% AEP

    Existing (m3/s)       0.61              0.72          1.11              1.41           1.68               1.99           2.23

    Mitigated (m3/s)      0.65              0.77          1.16              1.42           1.64               1.92           2.27

    Difference (m3/s)     0.05              0.05          0.05              0.01           -0.04              -0.07          0.03



A full summary of peak flow results is presented in Appendix C.




73 EUMUNDI - NOOSA ROAD, NOOSAVILLE I BBNE00529_0002_0001-REP-001-0                                                                       13
Log in to download the original file

SMP.pdf · 9.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.