Original source · versioned page text
Attachment 5 - Bushfire Hazard Assessment & Management Plan
Plans and drawings: the text below has words only, no drawings.
Very large file (11.4 MB): may take a few minutes to open.
Original PDF page 33, section 1. The text section number identifies this passage in the reader.
Bushfire Hazard Assessment & Management Plan v1 NCES REF: J000542 Lot 9 on RP225312 – 100 Cooyar Street, Noosa Heads Table 2 – Table 8.2.3.3 Bushfire Hazard Areas – Part 8 Overlay Code Noosa Plan 2020 PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES PROPOSED SOLUTION Safety of people and property PO1 AO1.1 This Bushfire Hazard Assessment and Management Plan has been prepared to Development maintains the safety of people and Development which will materially increase the number of people maintain the safety of people and property from the adverse impacts of bushfire. property from the adverse impacts of bushfire. living or congregating on premises, including reconfiguring a lot, is not AO1.1 – No increase in the number of people living or congregating on premises located within a medium or high bushfire hazard area. is proposed. AO1.2 AO1.2 – The majority of the proposed development footprint occupies the Development maximises setbacks from hazardous vegetation to existing building footprint. Only minor extension of the southern portion of the achieve an acceptable risk. existing development footprint would arise. The development maximises the setbacks via incorporation of all land between the building and the limit of the Editor’s Note —PSP8 Natural Hazards provides guidance for NSC fire break as the APZ. The extent of separation proposed in conjunction assessing bushfire hazard risk and preparing a bushfire hazard with the mitigating circumstances mentioned within this report has been management plan. identified herein as generating an acceptable risk. Impact on Ecologically Important Areas PO2 No acceptable outcome provided No new clearing is deemed necessary to enact bushfire mitigation measures on Bushfire mitigation measures do not adversely impact the site hence the development will not adversely impact on biodiversity values, on: connectivity, ecosystem functioning, and the long-term physical integrity of waterways, wetlands and areas of native vegetation. a) biodiversity values, connectivity and ecosystem functioning; and b) the long term physical integrity of waterways, wetland and areas of native vegetation. Water Supply for Fire Fighting Purposes AO3.1 – Reticulated water will be provided to the site. PO3 AO3.1 Development provides an adequate water supply for Premises are connected to the reticulated water supply. firefighting purpose which is reliable, safely located and freely accessible. Editor's note—For reconfiguring a lot, water supply needs to provide for a minimum flow and pressure of 10 litres a second at 200kPa at all times for firefighting purposes. OR AO3.2 Where there is no available reticulated water supply, the premises has: a) an accessible dam, swimming pool or water tank available for firefighting purposes with an onsite water volume of not less than 5,000 litres; and b) a water supply outlet pipe 50 millimetres in diameter fitted with a standard fire brigade fitting connected to the water supply (other than where the water supply is in a swimming pool or dam). © 2022 32
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.