Attachment 5 - Bushfire Hazard Assessment & Management Plan

of 61

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Very large file (11.4 MB): may take a few minutes to open.

Log in to see the plans as drawn

Original PDF page 34, section 1. The text section number identifies this passage in the reader.

Bushfire Hazard Assessment & Management Plan v1                                                                                                                                                  NCES REF: J000542
Lot 9 on RP225312 – 100 Cooyar Street, Noosa Heads




 PERFORMANCE OUTCOMES                                     ACCEPTABLE OUTCOMES                                                       PROPOSED SOLUTION

                                                          Editor’s Note—Water supply capacity for firefighting purposes is in
                                                          addition to water supply capacity for other uses and activities on the
                                                          premises.

 Essential Community Infrastructure

 PO4                                                       AO4.1                                                                    N/A – The proposed development does not involve essential community
 Essential community infrastructure is able to function Development involving essential community infrastructure is not             infrastructure.
 effectively during and immediately after bushfire events. located within a medium or high bushfire hazard area.

                                                          OR

                                                          AO4.2
                                                          Where located in a medium or high bushfire hazard area,
                                                          development involving essential community infrastructure is designed
                                                          to function effectively during and after a bushfire event in accordance
                                                          with a Bushfire Hazard Management Plan.

                                                          Editor’s Note— PSP8 Natural Hazards provides guidance for
                                                          assessing bushfire hazard risk and preparing a bushfire hazard
                                                          management plan.




 Hazardous Material

 PO5                                                 AO5                                                             AO5 – The proposed development does not involve the manufacture or storage
 Public safety and the environment are not adversely Hazardous materials are not manufactured or stored in bulk in a of hazardous materials in bulk.
 affected by the impacts of bushfire on hazardous bushfire hazard area.
 materials manufacturing or storing in bulk.

 Access and Evacuation Routes

 PO6                                                     AO6.1                                                                      PO6 – N/A – Development proposes to utilise existing road network, no new
 Roads provide for easy and safe evacuation of residents The road layout provides for through-roads and avoids cul-de-sacs          roads are proposed.
 of premises and access by emergency services.           and dead-end roads.
                                                         OR
                                                         AO6.2
                                                         The development has a perimeter road reserve with a minimum width
                                                         of 20 metres and maximum gradient of 12.5%.
                                                         OR
                                                         AO6.3
                                                         Cul-de-sacs or no-through roads are provided with fire trails or access
                                                         easements, which are capable of being navigated by conventional
                                                         vehicles and which link to through roads.
                                                         AO6.4
                                                         Safe access and egress is available at all times to all of the
                                                         development for emergency vehicles and personnel.




© 2022                                                                                                     33
Log in to download the original file

Attachment 5 - Bushfire Hazard Assessment & Management Plan.pdf · 11.4 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.