Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

Attachment 5 - Bushfire Hazard Assessment & Management Plan

of 61

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Very large file (11.4 MB): may take a few minutes to open.

Log in to see the plans as drawn

Original PDF page 37, section 1. The text section number identifies this passage in the reader.

Bushfire Hazard Assessment & Management Plan v1                                      NCES REF: J000542
Lot 9 on RP225312 – 100 Cooyar Street, Noosa Heads




1. Revegetation or rehabilitation areas contain patches of less than one ha of continuous fuel (i.e.,
surrounded by either no fuel or non-continuous fuel) and are further than 100 metres from the
interface with mapped medium, high or very high potential bushfire intensity patches greater than
two hectares in size. Vegetation corridors in these areas with continuous fuel, should be less than
50 metres in width and isolated patches of continuous fuel, should be less than 0.5 hectare.
No revegetation or rehabilitation areas are currently proposed. It is recommended that any
landscaping undertaken within the site facilitates conditions which satisfy Assessment Benchmark 7
below.
Assessment Benchmark 7
Where a requirement for an asset protection zone (or similar) exists
Landscaping treatments comprise only low threat vegetation, including grassland managed in a
minimal fuel condition, maintained lawns, golf courses, maintained public reserves and parklands,
vineyards, orchards, cultivated gardens, commercial nurseries, nature strips and windbreaks.
OR
Landscaping management maintains a potential available fuel load which is less than eight
tonnes/hectare in aggregate, and fuel structure which is discontinuous.
OR
Development includes a bushfire management plan for the maintenance of any identified asset
protection zone, including landscape design and ongoing vegetation management.
This document includes a Bushfire Management Plan which addresses Landscaping treatments.
.




© 2022                                               36
Log in to download the original file

Attachment 5 - Bushfire Hazard Assessment & Management Plan.pdf · 11.4 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.