Skip to the record
Every meeting, every word.

Original source · versioned page text

Change application_REPORT 29-11-2019_FINAL

of 79

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Specific Outcome                                               Probable Solution (if code assessment)                         Comment
                                                               and constructed to—                                            Subsequent Operational Works application is required to
                                                               a) have sign posting, particularly where they are commuter     be lodged and assessed against current local laws and
                                                               and recreational paths, and incorporate pavement               policies applying at the time of lodgement.
                                                               markings and line work in accordance with AUSTROADS
                                                               Part 14 Bicycles, Section 9;

                                                               b) have navigational signs generally in accordance with the
                                                               Manual for Uniform Traffic Control Devices Bicycle
                                                               Directional Signage Guidelines, and Australian Standard
                                                               1742.9: 2000 Manual of Uniform Traffic Control Devices
                                                               Bicycle Facilities;
                                                               c) be clearly delineated by pavement markings and
                                                               warning signs when an on-road bicycle lane;
                                                               d) incorporate kerb ramps at all intersections and
                                                               designated crossings;
                                                               e) have refuge islands on all roads with median strips;
                                                               f) have holding rails for cyclists at the intersection of
                                                               district collector, sub-arterial and arterial roads that are
                                                               positioned in accordance with Australian Standard
                                                               1742.9:2000 –Manual of Uniform Traffic Control Devices
                                                               Bicycle Facilities, and AUSTROADS Part 14 Bicycles Section
                                                               9;
                                                               g) have marked bicycle lanes, bicycle; AND awareness
                                                               zones or storage boxes; and
                                                               h) Include lighting to pedestrian and cycle pathways to
                                                               local government requirements and in accordance with
                                                               Australian Standard 1583.1 Road Lighting –Pedestrian area
                                                               (Category P) lighting.
O9 The subdivision layout is designed to facilitate linkages   S9.1 Where there is no relevant approved master plan,          PS9.1 Complies. The proposed development has been
with adjoining sites in the immediate area.                    concept plan, or site analysis plan, subdivision design        designed to achieve appropriate network linkages; these
                                                               incorporates future road, street, cycleway and pedestrian      have been conditioned on the existing approval.
                                                               path and open space connections to adjoining sites.
O10 Where the lots are to be used for Industrial business      No solution provided.                                          PO10 Not Applicable.
or Commercial business uses, the layout provides for
appropriate buffer areas, to mitigate possible impacts on



 JFP Ref: M1775                                                                                                                                                             Page 27
Log in to download the original file

Change application_REPORT 29-11-2019_FINAL.pdf · 9.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.