Specific Outcome                                             Probable Solution (if code assessment)                         Comment
nearby residences or other noise sensitive uses.
O11 For lots in the Rural Settlement Zone—a sealed access    No prescribed solution.                                        PO11 Complies. The development will be provided with
to the nearest urban settlement is available.                                                                               seal access to the nearest urban settlement.
14.187 Water supply for fire fighting
O12 An adequate and accessible water supply is provided      S12.1 For development in a water service area, water           PS12.1 – 12.2 The site is not in a water service area. The
for fire fighting purposes.                                  mains within the development shall comply with the:            approval has been conditioned to provide water tanks to
                                                             a) Queensland Water Resource Commission - Guidelines           ensure there is adequate water supply for fire fighting
                                                             for Planning and Design of Urban Water Supply Schemes;         purposes.
                                                             and
                                                             b) Australian Standard 2419 and the Water Providers
                                                             Network Model Criteria;
                                                             AND
                                                             S12.2 Facilitate the connection of fire services that comply
                                                             with the requirements of the Building Code of Australia.
14.188 Energy efficiency
O13 The street and lot orientation facilitates the           S13.1 For Community Title Development or urban                 PO13 & PO14 Complies. Each allotment has suitable
construction of energy efficient buildings that respond to   residential development each lot contains a rectangular        orientation for the future siting of a detached dwelling
the local climate conditions.                                house site area where the long axis faces true North or is     house with respect to solar orientation and energy
                                                             no more than 20 degrees off true north and has minimum         efficiency.
AND                                                          dimensions of—
O14 For residential development, the subdivision design      a) if the lot is between 450m² and 599m²- 10m x 15m; or
provides for the maximum practicable number of lots with     b) if the lot is less than 450m² - 9m x 15m.
house site areas that—
a) maximise solar access to the north in winter;             AND
b) minimise solar access to the east and west in the         S13.2 Community Title Development lots are generally
summer;                                                      rectangular in shape and have a maximum slope of—
c) maximise access to any prevailing summer breezes; and     a) 1 in 10 (10%); and
d) minimise exposure to prevailing winter winds.             b) 1 in 20 (5%) when measured from the front to the rear
                                                             of the lot.

                                                             S14.1 No Solution provided
14.189 Infrastructure
O15 Each lot is capable of being serviced by appropriate     S15.1 All lots are connected to power supply and               PS15.1 – 16.4 Complies. The development will be
levels of—                                                   telecommunications services;                                   appropriately connected to power supply and
a) water supply;                                             AND                                                            telecommunication services. The development approval



 JFP Ref: M1775                                                                                                                                                             Page 28
Log in to download the original file

Change application_REPORT 29-11-2019_FINAL.pdf · 9.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.