Change application_REPORT 29-11-2019_FINAL
Specific Outcome Probable Solution (if code assessment) Comment
O17 Essential network infrastructure (e.g. electricity, water S17.1 Components of the essential network infrastructure PS17.1 Not applicable. No service network infrastructure
supply, sewerage and telecommunications) maintains that are likely to fail or may result in contamination when will be located within areas subject to flooding.
effective function during and immediately after flood inundated by flood water—
events. a) comply with Table 13.12; or
b) are designed and constructed to exclude water
inundation or infiltration and resist hydrostatic and
hydrodynamic forces as a result of inundation.
Electricity supply infrastructure S18.1 Building footprints are situated clear of any power PS18.1 – 18.2 Complies. Building footprints are situated
O18 Uses and works maintain a safe distance from easements on-site; clear of power easements and the site is not situated
electrical infrastructure including substations, overhead AND within proximity to an electricity substation.
power lines, power poles and transformers. S18.2 Building footprints are not less than 50m from an
existing fenced electricity substation.
40
14.190 Earthworks and stormwater management
40
PSP1 identifies information that may be requested by Council including Stormwater Management Plans and Stormwater Master Plans.
O19 Stormwater run-off is managed so as not to cause any No solution provided PO19 Complies. All stormwater will be treated through
adverse impacts on the built or natural environment bio-retention basins prior to discharge. Details will be
including changes in quality, quantity or location of provided as part of the subsequent Operational Works
stormwater discharges. development application.
O20 Filling or excavation only occurs where it does not No prescribed solution. PO20 Complies. Filling or excavation will be minimised as
adversely impact on— far a practical to ensure no adverse impacts on receiving
a) watercourses, drainage lines and wetlands; or waters, vegetation or water levels on properties
b) vegetation on land identified on Biodiversity Overlay elsewhere. Details will be provided as part of subsequent
Maps OM1.1-OM9.1; or Operational Works application.
c) water levels on properties elsewhere.
14.191 Landscaping and visual amenity
O21 Land development responds to the distinctive S21.1 The natural landform and landscape are not PS21.1 Complies. The layout responds to the natural
landscape character of the site by utilising the natural modified to accommodate the development. landform and landscape character of the site through the
features of the site, which include— retention of vegetation and waterways.
a) watercourses and drainage lines;
b) significant trees;
c) understorey vegetation;
d) rock outcrops; and
JFP Ref: M1775 Page 30
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.