Change application_REPORT 29-11-2019_FINAL

of 79

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Specific Outcome                                                             Probable Solution (if code assessment)                        Comment
O17 Essential network infrastructure (e.g. electricity, water                S17.1 Components of the essential network infrastructure      PS17.1 Not applicable. No service network infrastructure
supply, sewerage and telecommunications) maintains                           that are likely to fail or may result in contamination when   will be located within areas subject to flooding.
effective function during and immediately after flood                        inundated by flood water—
events.                                                                      a) comply with Table 13.12; or
                                                                             b) are designed and constructed to exclude water
                                                                             inundation or infiltration and resist hydrostatic and
                                                                             hydrodynamic forces as a result of inundation.



Electricity supply infrastructure                                            S18.1 Building footprints are situated clear of any power     PS18.1 – 18.2 Complies. Building footprints are situated
O18 Uses and works maintain a safe distance from                             easements on-site;                                            clear of power easements and the site is not situated
electrical infrastructure including substations, overhead                    AND                                                           within proximity to an electricity substation.
power lines, power poles and transformers.                                   S18.2 Building footprints are not less than 50m from an
                                                                             existing fenced electricity substation.
                                                             40
14.190 Earthworks and stormwater management
40
     PSP1 identifies information that may be requested by Council including Stormwater Management Plans and Stormwater Master Plans.
O19 Stormwater run-off is managed so as not to cause any                     No solution provided                                          PO19 Complies. All stormwater will be treated through
adverse impacts on the built or natural environment                                                                                        bio-retention basins prior to discharge. Details will be
including changes in quality, quantity or location of                                                                                      provided as part of the subsequent Operational Works
stormwater discharges.                                                                                                                     development application.
O20 Filling or excavation only occurs where it does not                      No prescribed solution.                                       PO20 Complies. Filling or excavation will be minimised as
adversely impact on—                                                                                                                       far a practical to ensure no adverse impacts on receiving
a) watercourses, drainage lines and wetlands; or                                                                                           waters, vegetation or water levels on properties
b) vegetation on land identified on Biodiversity Overlay                                                                                   elsewhere. Details will be provided as part of subsequent
Maps OM1.1-OM9.1; or                                                                                                                       Operational Works application.
c) water levels on properties elsewhere.
14.191 Landscaping and visual amenity
O21 Land development responds to the distinctive                             S21.1 The natural landform and landscape are not              PS21.1 Complies. The layout responds to the natural
landscape character of the site by utilising the natural                     modified to accommodate the development.                      landform and landscape character of the site through the
features of the site, which include—                                                                                                       retention of vegetation and waterways.
a) watercourses and drainage lines;
b) significant trees;
c) understorey vegetation;
d) rock outcrops; and



     JFP Ref: M1775                                                                                                                                                                       Page 30
Log in to download the original file

Change application_REPORT 29-11-2019_FINAL.pdf · 9.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.