Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

Change application_REPORT 29-11-2019_FINAL

of 79

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Specific Outcome                                             Probable Solution (if code assessment)                                  Comment
b) reticulated sewerage;                                     S16.1 For lots in urban settlements—power supply and                    has appropriately conditioned this aspect.
c) stormwater drainage;                                      communications infrastructure are provided underground;
d) power supply; and                                         OR                                                                      It is noted that a subsequent operational works application
e) telecommunications;                                       S16.2 For lots elsewhere—power supply and                               is required to be lodged.
                                                             communications infrastructure are provided underground
O16 The design and provision of public services and          unless—
utilities, including sewerage, water, electricity, street    a) located in the Rural Zone or Rural Settlement Zone and
lighting and telecommunication services—                     where not in a Bushfire Hazard Area as defined on Overlay
a) meets the needs of users;                                 Maps OM1.4-OM9.4;
b) ensures health, safety and convenience of the             b) new low voltage lines can be strung from poles carrying
community;                                                   existing high voltage lines; or
c) protects the natural environmental values of the site     c) no extensions to the existing reticulation network is
and surrounds, including visual amenity and native           necessary; or
vegetation;                                                  d) it is necessary to cross a body of water;
d) are cost effective over their life cycle;
e) minimises adverse impacts to the environment              AND
(including the amenity of the local area) in the short and   S16.3 Street lighting is provided in accordance with Section
long term; and                                               3.19 of PSP5 Engineering Design Standards – Roads,
f) ensures that the existing systems are upgraded or         Drainage and Earthworks;
relocated to be capable of supporting the proposed           AND
development;                                                 S16.4 For lots not within a sewerage service area—the lot
                                                             has sufficient area and other attributes to ensure
                                                                                                     39
                                                             sustainable on-site sewerage disposal ;
                                                             Editor’s note:
                                                             PSP24 –Effluent Disposal details requirements for the
                                                             design and siting of effluent disposal systems where
                                                             located outside a sewerage service area. Compliance with
                                                             PSP24 will be considered as part of Council’s assessment of
                                                             the plumbing and drainage application.
                                                             39
                                                                PSP1 details information Council may request including an effluent
                                                             disposal report.




 JFP Ref: M1775                                                                                                                                                                       Page 29
Log in to download the original file

Change application_REPORT 29-11-2019_FINAL.pdf · 9.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.