Change application_REPORT 29-11-2019_FINAL
Specific Outcome Probable Solution (if code assessment) Comment
vegetation, wetlands, watercourses, drainage lines and physical linkages to these areas are provided; includes retention of watercourses. and
other native habitat areas, their associated buffers and AND includes pedestrian path connectivity.
linkages/corridors and natural and cultural features; and S25.3 Open space is provided adjacent to watercourses,
41
e) be cost effective to maintain . with roads servicing the linear parkland and lots located on
the opposite side of the road to the watercourse;
41
Council’s Sport and Recreation Guidelines provide further guidance for AND
designing and locating public open space within Noosa Shire.
S25.4 Public open space has good connectivity for users via
pedestrian and cycle paths.
O26 Land provided for active recreation areas is of a S26.1 Active parkland is of a compact shape free of PS26.1 – 26.4 Not applicable. The park is primarily for
physical standard and condition suitable for the intended irregular boundaries; conservation, passive recreation and pedestrian activity.
uses and is not subject to physical or other constraints AND
including contamination, environmental or biophysical S26.2 Active parkland is located on land that is exclusive
constraints or legislative protection that would encumber of—
its use. a) flood inundation below the 20% AEP (1:5 year ARI level);
b) land affected by stormwater or overland flow discharge
from adjacent allotments;
c) drainage reserves and detention basins, which cannot
be shown to safely and effectively contribute to the
network of parks and open space areas;
d) land with a slope, or subject to cut and fill with a batter
slope, that exceeds a slope of 1 in 67 (15%);
e) areas of land less than 15m wide, such as access and
service and utility easements;
f) land required to serve primarily as a buffer area to any
existing development or major transport corridor; and
g) power easements;
AND
S26.3 At least 10% of the total open space provision for
active parkland is exclusive of flood inundation below the
1% AEP (1:100 year ARI level or the highest recorded flood
level, whichever is the greatest;
AND
S26.4 Recreational facilities (including playgrounds,
pergolas, barbeques etc.) are setback a minimum of 30m
JFP Ref: M1775 Page 32
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.