Change application_REPORT 29-11-2019_FINAL

of 79

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

 CURRENT CONDITION                                            COMMENT / REQUIRED CHANGE TO CONDITION
 (iii) Aligned generally along the centreline of the          crossings shall be constructed such that they do not
 existing track and varied where necessary to preserve        change the standing water level within the land
 existing significant vegetation;                             upstream of the road;
 (iv) A temporary turnaround facility must be                 (iii) Aligned generally along the centreline of the
 constructed adjacent to the eastern boundary of Lot          existing track and varied where necessary to preserve
 9. The temporary turnaround facility must be in              existing significant vegetation;
 accordance with an Operational Works approval and            (iv) A temporary turnaround facility must be
 must be of sufficient size to accommodate the 3-             constructed adjacent to the western eastern boundary
 point turn manoeuvre of a Waste Collection Vehicle           of Lot 17 9. The temporary turnaround facility must be
 (WCV);                                                       in accordance with an Operational Works approval and
 (v) Intersections with the proposed internal road;           must be of sufficient size to accommodate the 3-point
 (vi) Installation of street lighting at the intersections    turn manoeuvre of a Waste Collection Vehicle (WCV);
 and elsewhere as required; and                               (v) Intersections with the proposed internal road;
 (vii) Connection to and reinstatement of the existing        (vi) Installation of street lighting at the intersections
 property accesses along Hollett Road.                        and elsewhere as required; and
 These works must be completed prior to the sealing           (vii) Connection to and reinstatement of the existing
 of the Survey Plan for Stage 1.                              property accesses along Hollett Road.
 (b) Stage 2 - that part of Hollett Road extending from       These works must be completed prior to the sealing of
 the prolongation of the eastern boundary of Lot 9 to         the Survey Plan for Stage 1.
 the eastern boundary of Lot 49 shall be:                     (b) Stage 2 - that part of Hollett Road extending from
 (i) Designed and constructed with a 7 metre wide             the prolongation of the eastern boundary of Lot 2 9 to
 kerb to kerb formation (flush kerb can be used where         the eastern boundary of Lot 6 49 shall be:
 applicable);                                                 (i) Designed and constructed with a 7 metre wide kerb
 (ii) Constructed such that it is immune from flooding        to kerb formation (flush kerb can be used where
 during a peak 10 year ARI event and has maximum              applicable);
 depth of inundation of 250 mm and DV < 0.6 during a          (ii) Constructed such that it is immune from flooding
 peak 100 year ARI flood event. Crossings shall be            during a peak 10 year ARI event and has maximum
 constructed such that there are no offsite flood             depth of inundation of 250 mm and DV < 0.6 during a
 impacts on land not owned by Council. Further, the           peak 100 year ARI flood event. Crossings shall be
 road crossings shall be constructed such that they do        constructed such that there are no offsite flood impacts
 not change the standing water level within the land          on land not owned by Council. Further, the road
 upstream of the road;                                        crossings shall be constructed such that they do not
 (iii) Aligned generally along the centreline of the          change the standing water level within the land
 existing track and varied where necessary to preserve        upstream of the road;
 existing significant vegetation;                             (iii) Aligned generally along the centreline of the
 (iv) Remove the temporary turnaround area adjacent           existing track and varied where necessary to preserve
 to Lot 9;                                                    existing significant vegetation;
 (v) A temporary turnaround facility must be                  (iv) Remove the temporary turnaround area adjacent
 constructed adjacent to the eastern boundary of Lot          to Lot 17 9;
 49. The temporary turnaround facility must be in             (v) A temporary turnaround facility must be
 accordance with an Operational Works approval and            constructed adjacent to the southern eastern boundary
 must be of sufficient size to accommodate the 3-             of Lot 6 49. The temporary turnaround facility must be
 point turn manoeuvre of a Waste Collection Vehicle           in accordance with an Operational Works approval and
 (WCV);                                                       must be of sufficient size to accommodate the 3-point
 (vi) Intersections with the proposed internal road;          turn manoeuvre of a Waste Collection Vehicle (WCV);
 and                                                          (vi) Intersections with the proposed internal road; and
 (vii) Installation of street lighting at the intersections   (vii) Installation of street lighting at the intersections
 and elsewhere as required.                                   and elsewhere as required.
 These works must be completed prior to the sealing           These works must be completed prior to the sealing of




JFP Ref: M1775                                                                                                       Page 7
Log in to download the original file

Change application_REPORT 29-11-2019_FINAL.pdf · 9.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.