Original source · versioned page text
Change application_REPORT 29-11-2019_FINAL
CURRENT CONDITION COMMENT / REQUIRED CHANGE TO CONDITION (iii) Aligned generally along the centreline of the crossings shall be constructed such that they do not existing track and varied where necessary to preserve change the standing water level within the land existing significant vegetation; upstream of the road; (iv) A temporary turnaround facility must be (iii) Aligned generally along the centreline of the constructed adjacent to the eastern boundary of Lot existing track and varied where necessary to preserve 9. The temporary turnaround facility must be in existing significant vegetation; accordance with an Operational Works approval and (iv) A temporary turnaround facility must be must be of sufficient size to accommodate the 3- constructed adjacent to the western eastern boundary point turn manoeuvre of a Waste Collection Vehicle of Lot 17 9. The temporary turnaround facility must be (WCV); in accordance with an Operational Works approval and (v) Intersections with the proposed internal road; must be of sufficient size to accommodate the 3-point (vi) Installation of street lighting at the intersections turn manoeuvre of a Waste Collection Vehicle (WCV); and elsewhere as required; and (v) Intersections with the proposed internal road; (vii) Connection to and reinstatement of the existing (vi) Installation of street lighting at the intersections property accesses along Hollett Road. and elsewhere as required; and These works must be completed prior to the sealing (vii) Connection to and reinstatement of the existing of the Survey Plan for Stage 1. property accesses along Hollett Road. (b) Stage 2 - that part of Hollett Road extending from These works must be completed prior to the sealing of the prolongation of the eastern boundary of Lot 9 to the Survey Plan for Stage 1. the eastern boundary of Lot 49 shall be: (b) Stage 2 - that part of Hollett Road extending from (i) Designed and constructed with a 7 metre wide the prolongation of the eastern boundary of Lot 2 9 to kerb to kerb formation (flush kerb can be used where the eastern boundary of Lot 6 49 shall be: applicable); (i) Designed and constructed with a 7 metre wide kerb (ii) Constructed such that it is immune from flooding to kerb formation (flush kerb can be used where during a peak 10 year ARI event and has maximum applicable); depth of inundation of 250 mm and DV < 0.6 during a (ii) Constructed such that it is immune from flooding peak 100 year ARI flood event. Crossings shall be during a peak 10 year ARI event and has maximum constructed such that there are no offsite flood depth of inundation of 250 mm and DV < 0.6 during a impacts on land not owned by Council. Further, the peak 100 year ARI flood event. Crossings shall be road crossings shall be constructed such that they do constructed such that there are no offsite flood impacts not change the standing water level within the land on land not owned by Council. Further, the road upstream of the road; crossings shall be constructed such that they do not (iii) Aligned generally along the centreline of the change the standing water level within the land existing track and varied where necessary to preserve upstream of the road; existing significant vegetation; (iii) Aligned generally along the centreline of the (iv) Remove the temporary turnaround area adjacent existing track and varied where necessary to preserve to Lot 9; existing significant vegetation; (v) A temporary turnaround facility must be (iv) Remove the temporary turnaround area adjacent constructed adjacent to the eastern boundary of Lot to Lot 17 9; 49. The temporary turnaround facility must be in (v) A temporary turnaround facility must be accordance with an Operational Works approval and constructed adjacent to the southern eastern boundary must be of sufficient size to accommodate the 3- of Lot 6 49. The temporary turnaround facility must be point turn manoeuvre of a Waste Collection Vehicle in accordance with an Operational Works approval and (WCV); must be of sufficient size to accommodate the 3-point (vi) Intersections with the proposed internal road; turn manoeuvre of a Waste Collection Vehicle (WCV); and (vi) Intersections with the proposed internal road; and (vii) Installation of street lighting at the intersections (vii) Installation of street lighting at the intersections and elsewhere as required. and elsewhere as required. These works must be completed prior to the sealing These works must be completed prior to the sealing of JFP Ref: M1775 Page 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.