Original source · versioned page text
Change application_REPORT 29-11-2019_FINAL
CURRENT CONDITION COMMENT / REQUIRED CHANGE TO CONDITION of the Survey Plan for Stage 2. the Survey Plan for Stage 2. (c) Stage 4 - that part of Hollett Road extending from (c) Stage 3 4 - that part of Hollett Road extending from the cul-de-sac turnaround area adjacent to Lot 49 to the cul-de-sac turnaround area adjacent to Lot 6 49 to the eastern side of the Walter Hay Drive culvert shall the eastern side of the Walter Hay Drive culvert shall be: be: (i) Designed and constructed with a 4 metre wide (i) Designed and constructed with a 4 metre wide sealed surface on a 4 metre wide formation; sealed surface on a 4 metre wide formation; (ii) Include a single passing bay on the eastern side of (ii) Include a single passing bay on the eastern side of Walter Hay Drive underpass and a "Give Way" sign, Walter Hay Drive underpass and a "Give Way" sign, and elsewhere where site lines are obstructed; and elsewhere where site lines are obstructed; (iii) That part of Hollett Road extending from the (iii) That part of Hollett Road extending from the eastern side of the culvert for Walter Hay Drive to the eastern side of the culvert for Walter Hay Drive to the existing access track within Lot 52 shall be designed existing access track within Lot 40 52 shall be designed and constructed with a 4 metre wide gravel surface and constructed with a 4 metre wide gravel surface formation; and formation; and (iv) The temporary turnaround adjacent to the (iv) The temporary turnaround adjacent to the eastern eastern boundary of Lot 49 must be sealed. boundary of Lot 6 49 must be sealed. 23. New roads as shown on the Approved Plans must Condition 23 needs to be updated to reflect the be constructed. The works must be undertaken in revised layout and staging boundaries as follows: accordance with an Operational Works approval and must include in particular: 23. New roads as shown on the Approved Plans must (a) Stage 1: be constructed. The works must be undertaken in (i) 6 metre wide kerb to kerb formation within a 20 accordance with an Operational Works approval and metre wide road reserve; must include in particular: (ii) sealing, kerbing and channelling (flush kerb may (a) Stage 1: be used where applicable); (i) 6 metre wide kerb to kerb formation within a 20 (iii) a cul-de-sac turnaround area with a minimum 9 metre wide road reserve; metre radius and minimum 4 metre wide verge at any (ii) sealing, kerbing and channelling (flush kerb may be point on the turning circle; and used where applicable); (iv) installation of street lighting where necessary. (iii) a cul-de-sac turnaround area with a minimum 9 These works must be completed prior to the sealing metre radius and minimum 4 metre wide verge at any of the Survey Plan for Stage 1. point on the turning circle; and (b) Stage 2: (iv) installation of street lighting where necessary. (i) 6 metre wide kerb to kerb formation within a 20 These works must be completed prior to the sealing of metre wide road reserve; the Survey Plan for Stage 1. (ii) a cul-de-sac turnaround area with a minimum 9 (b) Stage 2: metre radius and a minimum 4 metre wide verge at (i) 6 metre wide kerb to kerb formation within a 20 any point on the turning circle metre wide road reserve; (iii) sealing, kerbing and channelling (flush kerb may (ii) a cul-de-sac turnaround area with a minimum 9 be used where applicable); metre radius and a minimum 4 metre wide verge at (iv) a temporary turnaround facility must be any point on the turning circle constructed adjacent to the to the northern boundary (iii) sealing, kerbing and channelling (flush kerb may be of Lot 38;. The temporary turnaround facility must be used where applicable); in accordance with an Operational Works approval (iv) a temporary turnaround facility must be and must be of sufficient size to accommodate the 3- constructed adjacent to the to the northern boundary point turn manoeuvre of a Waste Collection Vehicle of Lot 17. Lot 38;. The temporary turnaround facility WCV); and must be in accordance with an Operational Works (v) installation of street lighting where necessary. approval and must be of sufficient size to JFP Ref: M1775 Page 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.