Council archive · source document
Attachment 14- Amended Traffic Impact Assessment Report MCU12/0208
LANE SUMMARY Site: 12 AM BG Existing
Emu Mountain Road/Walter Hay Drive/Eumarella Road
2012 AM Peak Hour Traffic Count
Existing Layout
Roundabout
Lane Use and Performance
Demand Flows Deg. Lane Average Level of 95% Back of Queue Lane SL Cap. Prob.
L T R Total HV Cap. Satn Util. Delay Service Vehicles Distance Length Type Adj. Block.
veh/h veh/h veh/h veh/h % veh/h v/c % sec veh m m % %
South: Emu Mountain Road
6
Lane 1 253 182 0 435 5.0 1513 0.288 98 3.3 LOS A 1.8 13.2 500 – 0.0 0.0
Lane 2 0 588 2 590 5.0 2021 0.292 100 3.1 LOS A 1.9 14.0 140 Turn Bay 0.0 0.0
Approach 253 771 2 1025 5.0 0.292 3.2 LOS A 1.9 14.0
East: Eumarella Road
Lane 1 12 15 33 59 5.0 1020 0.058 100 9.1 LOS A 0.3 1.9 500 – 0.0 0.0
Approach 12 15 33 59 5.0 0.058 9.1 LOS A 0.3 1.9
North: Walter Hay Drive
Lane 1 16 261 0 277 5.0 1509 0.183 100 3.5 LOS A 1.0 7.4 500 – 0.0 0.0
Lane 2 0 121 102 223 5.0 1219 0.183 100 7.4 LOS A 1.0 7.0 150 Turn Bay 0.0 0.0
Approach 16 382 102 500 5.0 0.183 5.2 LOS A 1.0 7.4
West: Emu Mountain Road
Lane 1 212 6 0 217 5.0 958 0.227 100 5.2 LOS A 1.1 8.0 500 – 0.0 0.0
Lane 2 0 3 293 296 5.0 1304 0.227 100 12.5 LOS A 1.2 8.8 200 Turn Bay 0.0 0.0
Approach 212 8 293 513 5.0 0.227 9.4 LOS A 1.2 8.8
Intersection 2097 5.0 0.292 5.4 LOS A 1.9 14.0
Level of Service (LOS) Method: Delay (RTA NSW).
Lane LOS values are based on average delay per lane.
Intersection and Approach LOS values are based on average delay for all lanes.
Roundabout Capacity Model: SIDRA Standard.
SIDRA Standard Delay Model used.
6 Lane underutilisation due to downstream effects
Processed: Monday, 5 August 2013 3:06:02 PM Copyright © 2000-2011 Akcelik and Associates Pty Ltd
SIDRA INTERSECTION 5.1.5.2006 www.sidrasolutions.com
Project: G:\510119 - Lake Weyba DA\510119 Modelling\RFI\2 Emu Mountain_Walter Hay_Eumarella 2013 04
15.sip
8000955, CARDNO, ENTERPRISE
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 14- Amended Traffic Impact Assessment Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 7.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.