Skip to the record
Accept no imitations.

Council archive · source document

Attachment 14- Amended Traffic Impact Assessment Report MCU12/0208

of 204

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

LANE SUMMARY                                                                                                      Site: 12 PM BG Existing
Emu Mountain Road/Walter Hay Drive/Eumarella Road
2012 PM Peak Peak Hour Traffic Count
Existing Layout
Roundabout



 Lane Use and Performance
                  Demand Flows                Deg. Lane Average Level of 95% Back of Queue Lane     SL    Cap. Prob.
                L     T     R Total HV Cap. Satn Util. Delay    Service Vehicles Distance Length Type      Adj. Block.
            veh/h veh/h veh/h veh/h % veh/h     v/c  %      sec              veh        m      m             %      %
 South: Emu Mountain Road
                                                        6
 Lane 1      208     81     0   289 5.0 1518 0.190   98     3.2  LOS A        1.1      8.0   500     –      0.0    0.0
 Lane 2         0 374      18   392 5.0 2025 0.193 100      3.4  LOS A        1.2      8.5   140 Turn Bay 0.0      0.0
 Approach       208   455      18    681 5.0           0.193               3.3   LOS A          1.2         8.5

 East: Eumarella Road
 Lane 1          2    12       16      29 5.0 1050 0.028        100        8.7   LOS A          0.1         0.8     500    –       0.0   0.0
 Approach        2    12       16      29 5.0      0.028                   8.7   LOS A          0.1         0.8

 North: Walter Hay Drive
 Lane 1         18 313         0     331 5.0 1604 0.206         100        3.2   LOS A          1.1         7.8     500     –      0.0   0.0
 Lane 2          0 153       118     271 5.0 1316 0.206         100        6.9   LOS A          1.0         7.5     150 Turn Bay   0.0   0.0
 Approach        18   466    118     602 5.0           0.206               4.9   LOS A          1.1         7.8

 West: Emu Mountain Road
 Lane 1     131      11   0          142 5.0 1134 0.125         100        4.0   LOS A          0.6         4.0     500     –      0.0   0.0
 Lane 2       0      11 172          182 5.0 1457 0.125         100       11.3   LOS A          0.6         4.3     200 Turn Bay   0.0   0.0
 Approach       131    22    172     324 5.0           0.125               8.1   LOS A          0.6         4.3

 Intersection                       1637 5.0           0.206               4.9   LOS A          1.2         8.5


Level of Service (LOS) Method: Delay (RTA NSW).
Lane LOS values are based on average delay per lane.
Intersection and Approach LOS values are based on average delay for all lanes.
Roundabout Capacity Model: SIDRA Standard.
SIDRA Standard Delay Model used.

6 Lane underutilisation due to downstream effects

Processed: Monday, 5 August 2013 3:06:04 PM          Copyright © 2000-2011 Akcelik and Associates Pty Ltd
SIDRA INTERSECTION 5.1.5.2006                        www.sidrasolutions.com
Project: G:\510119 - Lake Weyba DA\510119 Modelling\RFI\2 Emu Mountain_Walter Hay_Eumarella 2013 04
15.sip
8000955, CARDNO, ENTERPRISE

Used in these records

About this file

File size
7.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 14- Amended Traffic Impact Assessment Report MCU12_0208.pdf · 7.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.