Skip to the record
Noosa’s premier civic archive.

Council archive · source document

Attachment 14- Amended Traffic Impact Assessment Report MCU12/0208

of 204

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

LANE SUMMARY                                                                                                       Site: 28 PM BG Existing
Emu Mountain Road/Walter Hay Drive/Eumarella Road
2028 PM Peak Background Traffic
Existing Layout
Roundabout



 Lane Use and Performance
                  Demand Flows                Deg. Lane Average Level of 95% Back of Queue Lane     SL    Cap. Prob.
                L     T     R Total HV Cap. Satn Util. Delay    Service Vehicles Distance Length Type      Adj. Block.
            veh/h veh/h veh/h veh/h % veh/h     v/c  %      sec              veh        m      m             %      %
 South: Emu Mountain Road
                                                        6
 Lane 1      308    115     0   423 5.0 1438 0.294   98     3.6  LOS A        1.9     13.9   500     –      0.0    0.0
 Lane 2         0 558      26   584 5.0 1952 0.299 100      3.7  LOS A        2.1     15.1   140 Turn Bay 0.0      0.0
 Approach       308   673      26   1007 5.0           0.299               3.6   LOS A          2.1         15.1

 East: Eumarella Road
 Lane 1          3    17       23      43 5.0     870 0.050     100        9.7   LOS A          0.2          1.7     500    –       0.0   0.0
 Approach        3    17       23      43 5.0         0.050                9.7   LOS A          0.2          1.7

 North: Walter Hay Drive
 Lane 1         26 467         0     494 5.0 1512 0.327         100        3.6   LOS A          2.0         14.5     500     –      0.0   0.0
 Lane 2          0 223       175     398 5.0 1218 0.327         100        7.4   LOS A          1.9         13.6     150 Turn Bay   0.0   0.0
 Approach        26   691    175     892 5.0           0.327               5.3   LOS A          2.0         14.5

 West: Emu Mountain Road
 Lane 1     194      11  0           205 5.0 977 0.210          100        5.0   LOS A          1.0          7.6     500     –      0.0   0.0
 Lane 2       0     21 254           275 5.0 1309 0.210         100       11.8   LOS A          1.1          8.3     200 Turn Bay   0.0   0.0
 Approach       194    33    254     480 5.0           0.210               8.9   LOS A          1.1          8.3

 Intersection                       2422 5.0           0.327               5.4   LOS A          2.1         15.1


Level of Service (LOS) Method: Delay (RTA NSW).
Lane LOS values are based on average delay per lane.
Intersection and Approach LOS values are based on average delay for all lanes.
Roundabout Capacity Model: SIDRA Standard.
SIDRA Standard Delay Model used.

6 Lane underutilisation due to downstream effects

Processed: Monday, 5 August 2013 3:06:13 PM          Copyright © 2000-2011 Akcelik and Associates Pty Ltd
SIDRA INTERSECTION 5.1.5.2006                        www.sidrasolutions.com
Project: G:\510119 - Lake Weyba DA\510119 Modelling\RFI\2 Emu Mountain_Walter Hay_Eumarella 2013 04
15.sip
8000955, CARDNO, ENTERPRISE

Used in these records

About this file

File size
7.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 14- Amended Traffic Impact Assessment Report MCU12_0208.pdf · 7.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.